Tender Details
Particulars | Details |
---|---|
Title |
Upgradation Of Deotalab To Patharaha Via Dhangan Hatawa Soraihan Tola Amoch Pahadi Pahadi Nirpat Singh Godari Length 22.50 Km Under Crif Distt. Rewa (M.P.)
|
Description |
Upgradation Of Deotalab To Patharaha Via Dhangan Hatawa Soraihan Tola Amoch Pahadi Pahadi Nirpat Singh Godari Length
22.50 Km Under Crif Distt. Rewa (M.P.)
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_PWDRB_290938_1 |
Reference Number |
11/Gen./2023-24 |
Tender Fee | 10000 |
EMD | 35.87 Lakh |
Tender Value | |
Place | CHIEF ENGINEER PWD ZONE REWA |
Link | https://mptenders.gov.in |
Start Date | July 18, 2023 16:00 |
End Date |
04/09/2023 ( Expired 626 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreIndependent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreUpgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Read moreof your Industry type