Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Suply Of Composit Hose 4" (12 M Length),Suply Of Composit Hose 3" (12 M Length)
|
| Description |
|
| Organisation | NA | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2025/B/6518303 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 31, 2025 19:28 |
| End Date |
Expired
11/08/2025
Expired 426 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Suply of multi colour printing calender s with box, note book /(diary) and single sheet calender for the year 2027
Suply of multi colour printing calender s with box, note book /(diary) and single sheet calender for the year 2027
Read moreSuply of multi colour printing calender s with box, note book /(diary) and single sheet calender for the year 2027
Suply of multi colour printing calender s with box, note book /(diary) and single sheet calender for the year 2027
Read moreProcurement of stainless steel ball valve 20 mm and 25mm id vinylcorrg flex hose for use at chp, rgoc3.
Procurement of stainless steel ball valve 20 mm and 25mm id vinylcorrg flex hose for use at chp, rgoc3.
Read moreQuotation rate for supplying and instalation of jetting hose for jetting vehicles and maintenance of jetting and suckking and de selting vehicles
Quotation rate for supplying and instalation of jetting hose for jetting vehicles and maintenance of jetting and suckking and de selting vehicles.
Read moreProcurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Read moreSupply of electric winch 2mt capacity with wire rope of size 60m*18mm (length*diameter) for movement of manpower in surge chamber at slbhes, srisailam dam west nagarkurnool (dist) - 509326, telangana
Supply of electric winch 2mt capacity with wire rope of size 60m*18mm (length*diameter) for movement of manpower in surge chamber at slbhes, srisailam dam west nagarkurnool (dist) - 509326, telangana
Read moreConsultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreDesign, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type