Tender Details
Particulars | Details |
---|---|
Title |
For The Work Of Painting Of Cross Regulator And Escape Gate Of Left Bank Main Canal Rd. 63.42 Km Of R.A.B.L.S. Project.
|
Description |
For The Work Of Painting Of Cross Regulator And Escape Gate Of Left Bank Main Canal Rd. 63.42 Km Of R.A.B.L.S. Project.
|
Organisation | Narmada Valley Development Authority | State Govt. and UT |
Tender Id | 2025_NVDA_397173_1 |
Reference Number |
203/Ts. 2024-25 |
Tender Fee | 2295 |
EMD | 5633 |
Tender Value | |
Place | BARGI NAGAR |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=467407 |
Start Date | January 21, 2025 23:00 |
End Date |
10/02/2025 ( Expired 71 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreEngaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd
Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreInviting annual rate tender for maintenance work and purchase of painting material of ulb for the year 2025-26
Inviting annual rate tender for maintenance work and purchase of painting material of ulb for the year 2025-26
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and applying all types of painting as mentioned paint.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and applying all types of painting as mentioned paint.
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read morePreparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Read moreof your Industry type