Tender Details
Particulars | Details |
---|---|
Title |
For The Work Of Painting Of Cross Regulator And Escape Gate Of Left Bank Main Canal Rd. 63.42 Km Of R.A.B.L.S. Project.
|
Description |
For The Work Of Painting Of Cross Regulator And Escape Gate Of Left Bank Main Canal Rd. 63.42 Km Of R.A.B.L.S. Project.
|
Organisation | Narmada Valley Development Authority | State Govt. and UT |
Tender Id | 2025_NVDA_397173_1 |
Reference Number |
203/Ts. 2024-25 |
Tender Fee | 2295 |
EMD | 5633 |
Tender Value | |
Place | BARGI NAGAR |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=467407 |
Start Date | January 21, 2025 23:00 |
End Date |
10/02/2025 ( Expired 120 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreNib for supply and etc of 132 kv gss 113 rd sbs (distt jaisalmer) alongwith associated line (132 kv d/c parewar 113 rd sbs line (45 km d/c) and 02 no. of 132 kv bay at132 kv gss, parewar
Nib for supply and etc of 132 kv gss 113 rd sbs (distt jaisalmer) alongwith associated line (132 kv d/c parewar 113 rd sbs line (45 km d/c) and 02 no. of 132 kv bay at132 kv gss, parewar
Read moreToe protection and landslide stabilization work along left bank of river alaknanda at jyotirmath in district-chamoli (uttarakhand).
Toe protection and landslide stabilization work along left bank of river alaknanda at jyotirmath in district-chamoli (uttarakhand).
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreReplacement of steel wire ropes on head and cross regulators installed at km. 6.04 jwalapur on upper ganga canal.
Replacement of steel wire ropes on head and cross regulators installed at km. 6.04 jwalapur on upper ganga canal.&#x0d
Read moreReplacement of motors of gates of head and cross regulators installed at km 6.04 jwalapur on upper ganga canal.
Replacement of motors of gates of head and cross regulators installed at km 6.04 jwalapur on upper ganga canal.&#x0d
Read moreof your Industry type