Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Civil Works For The Replacement Of Instrument Landing System (Ils For Runway 27) And Associated Grading Works At Runway Strip
|
| Description |
Civil Works For The Replacement Of Instrument&Amp#X0d
Landing System (Ils For Runway 27) And Associated&Amp#X0d
Grading Works At Runway Strip
|
| Organisation | Cochin International Airport Ltd | State Govt. and UT |
| Tender Id | 2025_CIAL_788898_1 |
|
Reference Number |
CIAL/CIVIL/690/E34 |
| Tender Fee | 2950 |
| EMD | 20 Lakh |
| Tender Value | - |
| Place | CIAL Airside |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1316902 |
| Start Date | September 11, 2025 23:30 |
| End Date |
Expired
24/09/2025
Expired 382 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Read moreRewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Read moreTggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Tggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Read moreSupply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Supply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreInstallation of instrument landing system (ils)
Installation of ils, lp dme and flight calibration
Read moreGrading the adjacent areas of basic strip of runway and taxiway at vellore airport
Grading the adjacent areas of basic strip of runway and taxiway at vellore airport
Read morePloughing and grading work of resa - 14/32 and runway strip pockets at dr. babasaheb ambedkar international airport, nagpur
Ploughing and grading work of resa - 14/32 and runway strip pockets at dr. babasaheb ambedkar international airport, nagpur
Read moreof your Industry type