Tender Details

Particulars Details
Title
Civil Works For The Replacement Of Instrument Landing System (Ils For Runway 27) And Associated Grading Works At Runway Strip
Description
Civil Works For The Replacement Of Instrument&Amp#X0d Landing System (Ils For Runway 27) And Associated&Amp#X0d Grading Works At Runway Strip
Organisation Cochin International Airport Ltd | State Govt. and UT
Tender Id 2025_CIAL_788898_1
Reference
Number
CIAL/CIVIL/690/E34
Tender Fee 2950
EMD 20 Lakh
Tender Value -
Place CIAL Airside
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1316902

Start Date September 11, 2025 23:30
End Date
Expired 24/09/2025

Expired 382 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27

Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27

Read more
Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27

Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27

Read more
Tggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27

Tggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27

Read more
Supply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)

Supply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)

Read more
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Installation of instrument landing system (ils)

Installation of ils, lp dme and flight calibration

Read more
Grading the adjacent areas of basic strip of runway and taxiway at vellore airport

Grading the adjacent areas of basic strip of runway and taxiway at vellore airport

Read more
Ploughing and grading work of resa - 14/32 and runway strip pockets at dr. babasaheb ambedkar international airport, nagpur

Ploughing and grading work of resa - 14/32 and runway strip pockets at dr. babasaheb ambedkar international airport, nagpur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise