Tender Details

Particulars Details
Title
Part A Prov. Sew. Sch., Restoration Of Roads, Const. Of Mps, Stp Cum Fstp, R/Main And Offtake Chamber At Bilga Town, Distt. Jalandhar (Under Swachh Bharat Mission 2.0). Part B Stp 1 No. Capacity 2.00 Mld Cum 6 Kld Fstp.
Description
Part A Prov. Sew. Sch., Restoration Of Roads, Const. Of Mps, Stp Cum Fstp, R/Main And Offtake Chamber At Bilga Town, Distt. Jalandhar (Under Swachh Bharat Mission 2.0). Part B Stp 1 No. Capacity 2.00 Mld Cum 6 Kld Fstp.
Organisation Government of Punjab
Tender Id 2023_DLG_110513_1
Reference
Number
E-Tender Notice No.21 of 2023/PWSSD-1, JAL
Tender Fee 1000
EMD 18.48 Lakh
Tender Value
Place Jalandhar
Link https://eproc.punjab.gov.in
Start Date October 06, 2023 19:25
End Date

30/10/2023 ( Expired 558 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Prov. rcc np3 hdpe (900mm) sew. work at patti town

Dnit for balance work providing rcc np3 hdpe 900mm sewer, construction of main pumping station, restoration of roads and rising main di k9 mps to stp etc. complete and all other works contingent thereto at patti town distt. tarn taran under bucip

Read more
Prov and laying of upvc pipe sewer and rcc np3 sands pipe sewer,cons. of main hole chamber, cons.of ips, mps, laying of rising main at lalru part a const. of stp 3.00 mld and 3.50mld including fstp at lalru part b.

Prov and laying of upvc pipe sewer and rcc np3 sands pipe sewer,cons. of main hole chamber, cons.of ips, mps, laying of rising main at lalru part a&amp#x0d const. of stp 3.00 mld and 3.50mld including fstp at lalru part b.

Read more
Prov. sew scheme and 4 mld stp rayya town

Prov. and lay. cutting, jointing and testing of 500mm and 400mm i/d rcc np-3 s and s pipe inside hdpe lining, 200mm, 315mm o/d upvc sewer, construction of brick masonary manhole chamber, mps and 4 mld stp cum fstp 12 kld at rayya distt. asr

Read more
Prov.and laying of sewer,ips, mps, r/main at naya gaon. const. of stp 18.50 mld capacity and all other works contingent thereto in naya gaon, distt sas nagar. (sbm-2.0 scheme) part-b

Prov.and laying of sewer,ips, mps, r/main at naya gaon.&amp#x0d const. of stp 18.50 mld capacity and all other works contingent thereto in naya gaon, distt sas nagar. (sbm-2.0 scheme) part-b&amp#x0d &amp#x0d &amp#x0d &amp#x0d &amp#x0d

Read more
Part-a providing sewerage scheme const. of mps, stp (2.00mld), rising main and deep manhole cum screening chamber at alawalpur town distt. jalandhar (under swachh bharat mission 2.0). part-b const. of 2.00mld stp cum-fstp 6kld capacity.

Providing, laying, jointing and cutting of rcc np-3 pipe (400mm to 600mm i/d) sewer, const. of m.h. chamber, rcc vent shafts etc. and all other works contingent thereto.

Read more
Providing and laying of rcc np-3 pipes sewer, upvc pipe sewer, di k-7 pipe, rising main and construction of mps, stp cum fstp and all other works contingent thereto complete in all respects at kot shamir distt. bathinda. (under sbm 2.0)

Providing and laying of rcc np-3 pipes sewer, upvc pipe sewer, di k-7 pipe, rising main and construction of mps, stp cum fstp and all other works contingent thereto complete in all respects at kot shamir distt. bathinda. (under sbm 2.0)

Read more
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Read more
Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 2 mld with 6kld fstp and sixty months o and m works at narot jaimal singh town district pathankot

Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 2 mld with 6kld fstp and sixty months o and m works at narot jaimal singh town district pathankot

Read more
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 2.00 mld capacity stp cum 6 kld fstp along with o and m for 60 months after stabilization at dhilwan town distt. kapurthala under sbm 2.0

Read more
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 1.00 mld capacity stp cum 3 kld fstp along with o and m for 60 months after stabilization at nadala town distt. kapurthala under sbm 2.0

Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 1.00 mld capacity stp cum 3 kld fstp along with o and m for 60 months after stabilization at nadala town distt. kapurthala under sbm 2.0

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise