Tender Details

About Tender

🏗️ Invitation For Bids: Gabion Wall Construction For Ob Dump Protection 🏗️ South Eastern Coalfields Limited (Secl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of Gabion Walls To Protect The Ob Dump And Surrounding Structures At The Gevra Project Site Within The Gevra Area. 📅 Bid Submission Deadline: April 19, 2024, 5:00 Pm The Earnest Money Deposit (Emd) Is Set At Inr 114,500. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, In Accordance With The Project's Requirements. Keywords: Gabion Wall, Ob Dump Protection, Construction, South Eastern Coalfields Limited, Public Sector Undertaking, Tender, Bid Submission, Emd
Particulars Details
Title
Providing Gabion Wall For Protection Ob Dump And Also Structures Near Ob Dump At Gevra Project Of Gevra Area
Description
Providing Gabion Wall For Protection Ob Dump And Also Structures Near Ob Dump At Gevra Project Of Gevra Area
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_306214_1
Reference
Number
SECL/GA/ GM(C)/ETN/24-25/02 dtd.01.04.2024
Tender Fee 0
EMD 1.15 Lakh
Tender Value -
Place Gevra Area
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=317307

Start Date April 04, 2024 16:30
End Date
Expired 19/04/2024

Expired 907 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area

Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Contretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran

Contretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran

Read more
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Read more
Construction of avalanche protection structures incl proof check of design and drawing for safety of army transit camp at avalanche sites a53 a53a a53b on manali sarchu rd

Construction of avalanche protection structures incl proof check of design and drawing for safety of army transit camp at avalanche sites a53 a53a a53b on manali sarchu rd

Read more
Tn-08/ee/2026-27 restoration of damaged concrete structures for bank protection downstream of chudiala cross regulator located at km 16.854 of anupshahar branch canal. lot-01

Tn-08/ee/2026-27 restoration of damaged concrete structures for bank protection downstream of chudiala cross regulator located at km 16.854 of anupshahar branch canal. lot-01

Read more
Tn-08/ee/2026-27 restoration of damaged concrete structures for the protection of banks downstream of akbarpur cross regulator located at km 27.246 of anupshahar branch canal. lot-02

Tn-08/ee/2026-27 restoration of damaged concrete structures for the protection of banks downstream of akbarpur cross regulator located at km 27.246 of anupshahar branch canal. lot-02

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Restoration of damage caused by heavy rainfall repairing the protection wall slab etc structures of the k t weirs at nimgaon gangarda and nimgaon daku taluka karjat and at k t weirs chaundi taluka jamkhed

Restoration of damage caused by heavy rainfall repairing the protection wall slab etc structures of the k t weirs at nimgaon gangarda and nimgaon daku taluka karjat and at k t weirs chaundi taluka jamkhed

Read more
Rep/maint flushing of submersible pump sets, electric control panels, dg protection system at rushikuliya pump house and flame proof wiring , water and flame proof light fittings and fixtures at amn dump, supply depot mag guards under ge (i) gos

Rep/maint flushing of submersible pump sets, electric control panels, dg protection system at rushikuliya pump house and flame proof wiring, water and flame proof light fittings and fixtures at amn dump, supply depot mag guards under ge (i) gos

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise