Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Servicing, Checking, Calibration And Tuning Of Chhabi Make Battery Charger Installed At Unit No. 3 And 4, At Sgtps, Mppgcl, Birsinghpur.
|
| Description |
Servicing, Checking, Calibration And Tuning Of Chhabi Make Battery Charger Installed At Unit No. 3 And 4, At Sgtps, Mppgcl, Birsinghpur.
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_MPPGC_311405_1 |
|
Reference Number |
311405 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | PnW, SGTPS, MPPGCL, Bisinghpur |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | September 26, 2023 17:30 |
| End Date |
Expired
30/10/2023
Expired 1026 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Special repair of diso simulator building and unit hq building of no amtc at 2 amtc at afa hyderabad
Special repair of diso simulator building and unit hq building of no amtc at 2 amtc at afa hyderabad
Read moreRepairing / rewinding of 3 phase flame proof 50 hp, 550v, 1475 rpm, squirrel cage induction motor crompton greaves make of begunia w.t. plant at riverside si. no. bp/wtp/03
Repairing / rewinding of 3 phase flame proof 50 hp, 550v, 1475 rpm, squirrel cage induction motor crompton greaves make of begunia w.t. plant at riverside si. no. bp/wtp/03
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreTurnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Turnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Read moreServicing, checking, calibration and tuning of chhabi make battery charger installed at unit no. 3 and 4, sgtps, mppgcl, birsinghpur.
Servicing, checking, calibration and tuning of chhabi make battery charger installed at unit no. 3 and 4, sgtps, mppgcl, birsinghpur.
Read moreServicing, checking, calibration and tuning of hitachi hi-rel make ups system installed in ash handling plant of unit no. 3 and 4, at sgtps, mppgcl, brs.
Servicing, checking, calibration and tuning of hitachi hi-rel make ups system installed in ash handling plant of unit no. 3 and 4, at sgtps, mppgcl, brs.
Read moreWork of servicing, checking, calibration and tuning of controller panels of esp fields including transformer rectifier testing of unit no. 3 and 4, at sgtps,mppgcl, birsinghpur.
Work of servicing, checking, calibration and tuning of controller panels of esp fields including transformer rectifier testing of unit no. 3 and 4, at sgtps,mppgcl, birsinghpur.
Read moreof your Industry type