Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Replacement Of Bank Zone Tubes And Rear Water Wall Bend Portion Tubes Of
|
| Description |
|
| Organisation | Steel Authority of India Limited | Ministry of Steel |
| Tender Id | GEM/2023/B/4041564 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | October 04, 2023 22:12 |
| End Date |
Expired
18/10/2023
Expired 1081 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Furnace sidewall,boiler bank tubes,boiler side wall tubes,,furnace rear wall tubes,boiler rear wall
Read more
Labour contract for co-gen boiler evaporator damaged bank tubes and bend replacement work
Labour contract for co-gen boiler evaporator damaged bank tubes and bend replacement work
Read moreReplacement of eroded roof tubes, water wall bend tubes in boiler1, 2 and super heater coil in boiler2 at mohanur offsite
Replacement of eroded roof tubes, water wall bend tubes in boiler1, 2 and super heater coil in boiler2 at mohanur offsite
Read moreTtps mech ii bm unit ii replacement of eroded pressure parts tubes in water wall screen tubes super heater screen tubes rear water wall tubes left water wall tubes and hot reheater of unit ii boiler during overhaul 2025 2026
Ttps mech ii bm unit ii replacement of eroded pressure parts tubes in water wall screen tubes super heater screen tubes rear water wall tubes left water wall tubes and hot reheater of unit ii boiler during overhaul 2025 2026
Read moreContract work for replacement of rear side boiler bank tubes/ bac/engg/334/24/p1
Replacement of rear side boiler bank tubes
Read moreReplacement of eroded and defective water wall screen tubes
Replacement of eroded and defective water wall screen tubes and fin welding of pressure parts and metal build up on eroded portions of water wall tubes and coil tubes providing of shrouds in unit 5 boiler during annual overhaul period for the year 2025 26
Read moreInspection of bottom side gooseneck slope area of rear water wall screen tubes
Inspection of bottom side gooseneck slope area of rear water wall screen tubes
Read moreof your Industry type