Tender Details

Particulars Details
Title
Construction And Improvement Of External Infrastructure In Institute For Training Of Trainers (Itot) At Lalru Distt. Sas Nagar
Description
Construction And Improvement Of External Infrastructure In Institute For Training Of Trainers (Itot) At Lalru Distt. Sas Nagar
Organisation Government of Punjab
Tender Id 2023_CEPW_110494_1
Reference
Number
Tender Notice No. 24 Dated 06.10.2023
Tender Fee 20000
EMD 5.25 Lakh
Tender Value
Place Xen Provl. Divn. No.2 PWD B and R Patiala
Link https://eproc.punjab.gov.in
Start Date October 06, 2023 18:20
End Date

27/10/2023 ( Expired 563 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Read more
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda

Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda

Read more
Construction of flyover at kawas patiya at km14.400 and vup at reliance at km11.220 on nh53 of surat hazira section in gujarat on epc mode

Construction of flyover at kawas patiya at km14.400 and vup at reliance at km11.220 on nh53 of surat hazira section in gujarat on epc mode

Read more
Construction of engineering hall-1 (back-end facility for lwr - llwmp)

Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.

Read more
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in

Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in

Read more
Construction of bridge at saraipani near raghunath

Construction of bridge at saraipani near raghunath&amp#x0d house in ward no. 01 under nagar parishad&amp#x0d nowrozabad.

Read more
Construction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district

Construction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district

Read more
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat

Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat

Read more
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise