Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Rectification Of Frequent Pollution By Laying Of 100mm Dia Ci Distribution Lane
|
Description |
Rectification Of Frequent Pollution By Laying Of 100mm Dia Ci Distribution Lane At H.No.23 1 776 Near Allauddin Masjid Under Moghalpura Section, Sub Division Iii Of Operations And Maintenance Division I (Reserved For Waddera / Sagara Communities Only As Per G.O.Ms.No.59, I And Cad (Reforms) Department Dated:21.05.2018)
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 56 |
EMD | 1561 |
Tender Value | |
Place | TS |
Link |
AAAAAAAAAA Login to view |
Start Date | June 18, 2025 22:30 |
End Date |
25/06/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Redevelopment of kamathipura cluster lane 1 to 15, kamathipura, mumbai, through a construction- cum development contract by appointment of c and da
Redevelopment of kamathipura cluster lane 1 to 15, kamathipura, mumbai, through a construction- cum development contract by appointment of c and da
Read moreProviding, laying, jointing, testing and commissioning of 315 mm dia hdpe pipeline at from mahima smart city super corridor road of zone no.16 ward no.15 (as per schedule)
Providing, laying, jointing, testing and commissioning of 315 mm dia hdpe pipeline at from mahima smart city super corridor road of zone no.16 ward no.15 (as per schedule)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreProviding and laying of 110 mm dia and 90 mm dia pvc pipeline in various lanes of ward no. 12
Providing and laying of 110 mm dia and 90 mm dia pvc pipeline in various lanes of ward no. 12
Read moreSurvey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and
Survey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreWs scheme of jjm 22-23/const. of 0.55 mgd capacity swtp based on existing river thalgang at tarakpur of tarakpur gp of kadamtala block/sh- providing,laying distribution pipeline providing domestic connection etc of dws subdivision dharmanagar/gr-iv
Ws scheme of jjm 22-23/const. of 0.55 mgd capacity swtp based on existing river thalgang at tarakpur of tarakpur gp of kadamtala block/sh- providing,laying distribution pipeline providing domestic connection etc of dws subdivision dharmanagar/gr-iv
Read moreRepair , maint and replacement of rising mains, entire distribution pipe line network gi, ci, hdpe, pvc pipe valves and allied work at mh, jrc, jla, pb marg otm and md accn area under ge east bareilly
Repair , maint and replacement of rising mains, entire distribution pipe 
 line network gi, ci, hdpe, pvc pipe valves and allied work at mh, jrc, jla, pb marg otm and md accn area under ge east bareilly
Read moreProviding laying and jointing 05 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 48 file no. 11/25x9/1
Providing laying and jointing 05 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 48 file no. 11/25x9/1
Read moreof your Industry type