Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Turip 2024 25 Package 32 Providing And Relaying Of Cement Concrete Pavement At 1) Sree Neela Kanda Nayan 1st Street, 2) Sree Neela Kanda Nayan 2nd Street, 3) Sree Neela Kanda Nayan 1st Cross Street, 4) Sree Neela Kanda Nayan 2nd Cross Street, 5) Sree N
|
| Description |
Turip 2024 25 Package 32 Providing And Relaying Of Cement Concrete Pavement At 1) Sree Neela Kanda Nayan 1st Street, 2) Sree Neela Kanda Nayan 2nd Street, 3) Sree Neela Kanda Nayan 1st Cross Street, 4) Sree Neela Kanda Nayan 2nd Cross Street, 5) Sree N
|
| Organisation | MAWS | State Govt. and UT |
| Tender Id | 2024_MAWS_425127_1 |
|
Reference Number |
54/2023-24/32 |
| Tender Fee | 0 |
| EMD | 58250 |
| Tender Value | - |
| Place | S.N.High road main office Tirunelveli corporation |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=505358 |
| Start Date | February 15, 2024 14:30 |
| End Date |
Expired
23/02/2024
Expired 965 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair work for damaged culvert at 1st cross st i t i college road in ward no 32
Repair work for damaged culvert at 1st cross st i t i college road in ward no 32
Read moreRestoration of bt road at ward no 9 chairman mani nagar main street and 1st and 2nd cross street in panruti municipality
Restoration of bt road at ward no 9 chairman mani nagar main street and 1st and 2nd cross street in panruti municipality
Read moreSuction valve service kit 2nd stage 1903005395,suction valve service kit 1st stage 1903005195,discharge valve service kit 1st stage 1903005295,discharge valve service kit 2nd stage 1903005495,piston ring replacement kit 1903009195,piston ring replacement kit 1903009295,rider ring 1st stage 1903396808,rider ring 2nd stage 1903394408,tension nut 1903671803,oil wiper 1903145908,cross head nut 1901002924
Suction valve service kit 2nd stage 1903005395,suction valve service kit 1st stage 1903005195,discharge valve service kit 1st stage 1903005295,discharge valve service kit 2nd stage 1903005495,piston ring replacement kit 1903009195,piston ring replacement kit 1903009295,rider ring 1st stage 1903396808,rider ring 2nd stage 1903394408,tension nut 1903671803,oil wiper 1903145908,cross head nut 1901002924
Read moreProject management consultancy services for the work of improvement to industrial layout including reconstruction and resurfacing of 12m & 18m wide roads including flexible pavement, construction of rcc side drains, rcc cross drainage in bommasandra 1st, 2nd & 3rd phase industrial area, anekal taluk, bengaluru urban district.
Project management consultancy services for the work of improvement to industrial layout including reconstruction and resurfacing of 12m & 18m wide roads including flexible pavement, construction of rcc side drains, rcc cross drainage in bommasandra 1st, 2nd & 3rd phase industrial area, anekal taluk, bengaluru urban district.
Read moreConstruction of road from attoli to chella,tehsil haveli poonch in km 1st rd 0 to km 4th rd 1000 by way of earth work in cutting,cross drainage,walling, providing and laying of 150mm thick wbm grade-ii,under nabard ridf xxviii.2nd call
Construction of road from attoli to chella,tehsil haveli poonch in km 1st rd 0 to km 4th rd 1000 by way of earth work in cutting,cross drainage,walling, providing and laying of 150mm thick wbm grade-ii,under nabard ridf xxviii.2nd call
Read moreInternal gear 80 t,1st. driven gear - 72 t,sun gear 24 t,planetary pinion 26 t,2nd. driven gear,isolator 300 amps, on-off,brush, crbn, 38 x 32 x 25 mm, grmise of acpl,brush holder for 50 kw-550v lt ac sliprin,insulator bshng, 11 kv, prcln
Internal gear 80 t,1st. driven gear - 72 t,sun gear 24 t,planetary pinion 26 t,2nd. driven gear,isolator 300 amps, on-off,brush, crbn, 38 x 32 x 25 mm, grmise of acpl,brush holder for 50 kw-550v lt ac sliprin,insulator bshng, 11 kv, prcln
Read moreAssy fuel-water separator part no 252709120254,kit universal joint part no 217141000107,oil filter element part no 252518130164,assy water pupm bs 3 by 4 part no 252520100180,v belt cogged 995mm part no 252520156344,engine mounting pad front part no 257624100101,engine mounting pad rear part no 257624200118,clutch master cylinder 25.4 part no 261829100107,power stearing pump part no 261846600101,clutch disc 352dia part no 275225200106,clutch cover 352 dia part no 275225400105,assy cross bs 1 2 3 4 part no 280941400101,clutch master cylinder 25.4 part no 503029100164,accelerator module part no 550730100102,clutch disc 352dia part no 581225200101,clutch cover 352 bs 3 4 part no 581225400101,kit brake liner front part no 885442011618,kit brake liner rear part no 885442021618,centre bearing part no 275041304303,leaf spring 1st part no 263232100131,second leaf part no 263232107148,leaf spring 2nd part no 263232407173,set of 2516 air filter catridge part no 885409052516
Assy fuel-water separator part no 252709120254,kit universal joint part no 217141000107,oil filter element part no 252518130164,assy water pupm bs 3 by 4 part no 252520100180,v belt cogged 995mm part no 252520156344,engine mounting pad front part no 257624100101,engine mounting pad rear part no 257624200118,clutch master cylinder 25.4 part no 261829100107,power stearing pump part no 261846600101,clutch disc 352dia part no 275225200106,clutch cover 352 dia part no 275225400105,assy cross bs 1 2 3 4 part no 280941400101,clutch master cylinder 25.4 part no 503029100164,accelerator module part no 550730100102,clutch disc 352dia part no 581225200101,clutch cover 352 bs 3 4 part no 581225400101,kit brake liner front part no 885442011618,kit brake liner rear part no 885442021618,centre bearing part no 275041304303,leaf spring 1st part no 263232100131,second leaf part no 263232107148,leaf spring 2nd part no 263232407173,set of 2516 air filter catridge part no 885409052516
Read moreTurip 2024-25 - p32-providing and relaying of cement concrete pavement at 1) sree neela kandanayan 1st street, 2) sree neela kandanayan 2nd street, 3) sree neela kandanayan 1st cross street, 4) sree neela kandanayan 2nd cross street, 5) sree neela
Turip 2024-25 - p32-providing and relaying of cement concrete pavement at 1) sree neela kandanayan 1st street, 2) sree neela kandanayan 2nd street, 3) sree neela kandanayan 1st cross street, 4) sree neela kandanayan 2nd cross street, 5) sree neela
Read moreRelaying of b.t road at w.no.34, ganapathi nagar 1st cross , ganapathi nagar 1st cross 1st street, ganapathi nagar 1st cross 2nd street in hosur city municipal corporation
Relaying of b.t road at w.no.34, ganapathi nagar 1st cross , ganapathi nagar 1st cross 1st street, ganapathi nagar 1st cross 2nd street in hosur city municipal corporation
Read moreRelaying of cement concrete pavement main cross street
Relaying of cement concrete pavement main cross street
Read moreof your Industry type