Tender Details
Particulars | Details |
---|---|
Title |
Jungle Clearance Rectification Of Damaged Shoulders Removal Of Unserviceable Soil And Longitudinal Unlined Drain Work From Km 154 200 To Km 161 380 Of Nh 275 Bantwala Bengaluru Section
|
Description |
Jungle Clearance Rectification Of Damaged Shoulders Removal Of Unserviceable Soil And Longitudinal Unlined Drain Work From Km 154 200 To Km 161 380 Of Nh 275 Bantwala Bengaluru Section
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_MoRTH_781156_1 |
Reference Number |
11 2023 24 dated 13.11.2023 |
Tender Fee | 1000 |
EMD | 28500 |
Tender Value | |
Place | O/o EE NHD Bng |
Link | https://eprocure.gov.in |
Start Date | November 15, 2023 20:40 |
End Date |
22/11/2023 ( Expired 515 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreSc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan
Sc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreMonsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Read moreMonsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Monsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Read moreWidening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Read moreWidening to two lane paved shoulders from km 0.000 mudigere to km 26.326 mugutihalli of nh 173 mudigere kadur section in the state of karnataka on epc mode
Widening to two lane paved shoulders from km 0.000 mudigere to km 26.326 mugutihalli of nh 173 mudigere kadur section in the state of karnataka on epc mode
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreof your Industry type