Tender Details

Particulars Details
Title
Custom Bid For Services Maintenance Of Instrumentation Installation Of Rmhs Coke Oven By Product
Description
Organisation NMDC STEEL Limited | Ministry of Steel
Tender Id GEM/2024/B/5537705
Reference
Number
Tender Fee
EMD
Tender Value 2 Crore
Place
Link https://bidplus.gem.gov.in/all-bids
Start Date October 23, 2024 21:32
End Date

12/11/2024 ( Expired 207 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 159 Lakhs Experience with Gov. Required: Years Project Experience Required: Yes
Buyer Details
Name: Pankaj Kumar Sony
Address: Pankaj Kumar Sony,[email protected],NMDC STEEL LIMITED, C/o NMDC Iron & Steel Plant, Nagarnar, postbox no.2, Jagdalpur , Dist .Bastar, CG 494001,Bastar,CHHATTISGARH,494001,India
Ministry: Ministry Of Steel
Department: Nmdc Steel Limited
Organisation: Nmdc Steel Limited
Office Address: Nmdc Iron Steel Plant Jagdalpur Bastar Cg 494001
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis

Read more
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Read more
Supply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations

Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.

Read more
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh

Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise