Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
At Barauni : Provision Of Shunting Neck &Amp Laying Of B.G. Track, Flooring Work &Amp Fencing Work In New Washing Pit.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73855011 |
|
Reference Number |
22SEE23-24-23 |
| Tender Fee | 0 |
| EMD | 2.49 Lakh |
| Tender Value | - |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73855011/viewNitPdf_4494624.pdf |
| Start Date | March 02, 2024 01:26 |
| End Date |
Expired
27/03/2024
Expired 934 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(i) electrical work in connection with provision of shunting neck and stabling lines with washing pit at lalitgram under samastipur division.(ii) electrical work in connection with provision of administrative building and ancillary building for coaching depot at lalitgram station (llp) under samastipur division.
(i) electrical work in connection with provision of shunting neck and stabling lines with washing pit at lalitgram under samastipur division.(ii) electrical work in connection with provision of administrative building and ancillary building for coaching depot at lalitgram station (llp) under samastipur division.
Read moreElectrical work in connection with rebuilding of rail beam of old washing line no. 1 & 2 of lko yard, improvement/up-gradation of north coaching complex washing line and provision of fencing towards north side pathway of sadar washing line and improvement of end ramp at bsb end flooring up to c&w office including repairs to office, etc. at lko, and provision of covered shedand road access for art/lko under lko c&w depot.
Electrical work in connection with rebuilding of rail beam of old washing line no. 1 & 2 of lko yard, improvement/up-gradation of north coaching complex washing line and provision of fencing towards north side pathway of sadar washing line and improvement of end ramp at bsb end flooring up to c&w office including repairs to office, etc. at lko, and provision of covered shedand road access for art/lko under lko c&w depot.
Read more(a)proposed extension(150 m) of ngp end shunting neck to convert track machine siding at pulgaon yard(csr=280 m)under sse(p.way)pulgaon section under aden wardha sub-division.(b)ngp division casual renewal of cs,cmsc,tws,ds & ttr(tfr).(c)ngp division-casual renewal of rails=3.34 kms & casual renewal of sleepers=3.34 kms.(d)nagpur division-replacement of overaged sej by twsej-41 sets. (e)ttr(fs+tws+wcmsc)=8nos(1 in 8.5=5nos,1 in 12=3nos)g.total=8 nos in branch line of ngp division.(f)pr
(a)proposed extension(150 m) of ngp end shunting neck to convert track machine siding at pulgaon yard(csr=280 m)under sse(p.way)pulgaon section under aden wardha sub-division.(b)ngp division casual renewal of cs,cmsc,tws,ds & ttr(tfr).(c)ngp division-casual renewal of rails=3.34 kms & casual renewal of sleepers=3.34 kms.(d)nagpur division-replacement of overaged sej by twsej-41 sets. (e)ttr(fs+tws+wcmsc)=8nos(1 in 8.5=5nos,1 in 12=3nos)g.total=8 nos in branch line of ngp division.(f)pr
Read moreAt bju- electrical work in connection with provision of shunting neck & laying of bg track, flooring work and fencing work in new washing pit.
For complete deion and other details, please refer to tender
Read moreS&t work in connection with provision of shunting neck and laying of bg track, flooring work and fencing work in new washing pit at bju.
For complete deion and other details, please refer to tender
Read moreCbj track work for provision of 600m new stabling line extension of existing stable line and washing line up 600m & making shunting neck at cbj end. under sanction work clutterbuck ganj. provision of 600m new stabling line extension of existing stable line and washing line up 600m & making shunting neck at cbj end.
For complete deion and other details, please refer to tender
Read moreMaduri division:- aden/dindigul-sub division:- provision of shunting neck at dindigul yard (track portion)
For complete deion and other details, please refer to tender
Read moreMaduri division:- aden/dindigul-sub division:- provision of shunting neck at dindigul yard (track portion)
For complete deion and other details, please refer to tender
Read moreExtension of shunting neck at qln and relocation of mrv siding at tvc - track works.
For complete deion and other details, please refer to tender
Read moreGtl div:crossovers for common loop & shunting neck at rachagunneri(rcg) in renigunta(ru) - gudur(gdr) section
For complete deion and other details, please refer to tender
Read moreof your Industry type