Tender Details
Particulars | Details |
---|---|
Title |
Dpr For Construction Of Grade Separators At Sarona Chowk (Ch. 279.750) Udyog Bhawan (269.000) Telibandha Chowk (Ch. 268.000) On Raipur City Portion Of Nh53 At Raipur Aurang Section And Ape(10.700) Chowk Of Nh 30 Raipur Kodebad In Chhattisgarh
|
Description |
Dpr For Construction Of Grade Separators At Sarona Chowk (Ch. 279.750) Udyog Bhawan (269.000) Telibandha Chowk (Ch. 268.000) On Raipur City Portion Of Nh53 At Raipur Aurang Section And Ape(10.700) Chowk Of Nh 30 Raipur Kodebad In Chhattisgarh
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link |
AAAAAAAAAA Login to view |
Start Date | May 16, 2025 22:30 |
End Date |
23/06/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreCurve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Construction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreDesign and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Design and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Read moreConstruction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Read moreof your Industry type