Tender Details
Particulars | Details |
---|---|
Title |
Ktps Vii Stage/Paloncha Supply Of Porous Tile For Esp Hoppers In Fly Ash System
|
Description |
Tggenco Ktps Vii Stage/Paloncha Supply Of Porous Tile For Esp Hoppers In Fly Ash System
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | TS |
Link |
AAAAAAAAAA Login to view |
Start Date | May 31, 2025 16:20 |
End Date |
17/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreEngaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Read moreConstruction of rcc draintotal 8.06 km of nh-512 nh division vii
Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569
Read moreSupply of advanced high energy linear accelerator system 01 unit
Supply of advanced high energy linear accelerator system 01 unit for the department of radiation oncology
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreProcurement of ash slurry density meter installed in silo area at ahp for imd-4, stps, sarni.
Procurement of ash slurry density meter installed in silo area at ahp for imd-4, stps, sarni.
Read moreSupply and installation of benchtop lcms/ms system for biochemistry
Supply and installation of benchtop lcms/ms system for biochemistry
Read moreSupply of permanently lubricated hdpe telecom duct (size 40/33 mm) and accessories for use as underground optical fiber cable conduits in railtel optic fiber network for deposit work and onm purposes
Supply of permanently lubricated hdpe telecom duct (size 40/33 mm) and accessories for use as underground optical fiber cable conduits in railtel optic fiber network for deposit work and onm purposes
Read moreDesign, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Design, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Read moreof your Industry type