Tender Details

Particulars Details
Title
Supply Erection And Commissioning Of Highway Lighting For Structure Approaches And Service Roads In The Section Of Thumbipadi Salem Namakkal From Km 180.000 To Km 248.625 Of New Nh 44 (Old Nh 7) In The State Of Tamil Nadu
Description
Supply Erection And Commissioning Of Highway Lighting For Structure Approaches And Service Roads In The Section Of Thumbipadi Salem Namakkal From Km 180.000 To Km 248.625 Of New Nh 44 (Old Nh 7) In The State Of Tamil Nadu
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_224000_1
Reference
Number
NHAI/ROC/HwayLight/24-25/197
Tender Fee 25000
EMD 7.4 Lakh
Tender Value
Place Thumbipadi - Salem - Namakkal
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=250128
Start Date January 15, 2025 21:15
End Date

13/02/2025 ( Expired 111 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Read more
Construction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode

Construction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode

Read more
Realignment from km 15/4 to km 16/350 of nh -179a (salem- thirupathur - vaniyambadi) under ap 2024- 25 in the state of tamil nadu

Realignment from km 15/4 to km 16/350 of nh -179a (salem- thirupathur - vaniyambadi) under ap 2024- 25 in the state of tamil nadu

Read more
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
One time improvement in bhoura town portion, shahpur town portion and padhar town portion on nh 69 (old) nh 46 (new) itarsi betul road in the state of madhya pradesh on epc mode

One time improvement in bhoura town portion, shahpur town portion and padhar town portion on nh 69 (old) nh 46 (new) itarsi betul road in the state of madhya pradesh on epc mode

Read more
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis

Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis

Read more
4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).

4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise