Particulars | Details |
---|---|
Title |
Operation And Maintenance Including Incident Management For The 4 Lane Stretch Of Kathipudi To Of Kakinada Bypass From Km0.000 To Km27.500 Section Of Nh216 In The State Of Andhra Pradesh
|
Description |
Operation And Maintenance Including Incident Management For The 4 Lane Stretch Of Kathipudi To Of Kakinada Bypass From Km0.000 To Km27.500 Section Of Nh216 In The State Of Andhra Pradesh
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_223513_1 |
Reference Number |
NHAI/RO-VJA/OM/KTI-KKD/2025 |
Tender Fee | 50000 |
EMD | 17.32 Lakh |
Tender Value | |
Place | Kakinada |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=249317 |
Start Date | January 09, 2025 18:00 |
End Date |
22/02/2025 ( Expired 133 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read morePerformance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years
Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreConsultancy services for preparation of dpr for the work construction of 4 lane bypass to mahabubnagar town from km 275.350 of nh 167 to km 13.285 of nh 167n in the state of telangana
Consultancy services for preparation of dpr for the work construction of 4 lane bypass to mahabubnagar town from km 275.350 of nh 167 to km 13.285 of nh 167n in the state of telangana
Read moreConsultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Read moreConsultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c
Consultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c
Read moreof your Industry type