Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Coa Provision Of Additional Inspection Pit On Ioh Lines 11 &Amp 12 And Extension Of Existing Pits For Attention Of Lhb Coaches In Coaching Depot Coa.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72713188 |
|
Reference Number |
E-01-North-BZA-2024 |
| Tender Fee | 0 |
| EMD | 2.3 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/72713188/viewNitPdf_4433678.pdf |
| Start Date | January 10, 2024 23:40 |
| End Date |
Expired
02/02/2024
Expired 989 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Patch work of fleet graphics film for exterior of lhb coaches for gaya coaching depot. qty.1 set
Patch work of fleet graphics film for exterior of lhb coaches for gaya coaching depot. qty.1 set
Read moreCustom bid for services - estimated value for eddy current array testing (eca) of wheel sets of lhb coaches at coaching depot kacheguda
Custom bid for services - estimated value for eddy current array testing (eca) of wheel sets of lhb coaches at coaching depot kacheguda
Read moreSupply, installation & commissioning of compressed air pipeline on all washing pits of coaching depot bju.
Supply, installation & commissioning of compressed air pipeline on all washing pits of coaching depot bju.
Read moreCorrosion (cross members) attention and air brake system attention in lhb coaches at the premises of central workshops, golden rock, southern railway, tiruchirappalli - 620004.
Corrosion (cross members) attention and air brake system attention in lhb coaches at the premises of central workshops, golden rock, southern railway, tiruchirappalli - 620004.
Read moreProvision/modification of ohe arrangement at coaching depot, bilaspur for pit lines 2 & 3
Provision/modification of ohe arrangement at coaching depot, bilaspur for pit lines 2 & 3
Read moreWork of standardization of water filling assembly for lhb type ac includingpower car and scn eog coaches as per rcf cai at ltt coaching depot.
Work of standardization of water filling assembly for lhb type ac includingpower car and scn eog coaches as per rcf cai at ltt coaching depot.
Read moreScheduled maintenance and repair contract of rmpus of eog lhb rmpu ac coaches including their sick line attention for heavy repairs work & on-board electrical escorting duties on ac coaches in primary based trains of electrical coaching acc/dli & elect/chg./dee depot over delhi division for three years.
Scheduled maintenance and repair contract of rmpus of eog lhb rmpu ac coaches including their sick line attention for heavy repairs work & on-board electrical escorting duties on ac coaches in primary based trains of electrical coaching acc/dli & elect/chg./dee depot over delhi division for three years.
Read moreModification in feed pipe and air suspension line for connecting 150 l auxiliary reservoir in lhb coaches with material at bdts coaching depot for a period of 06 months.
Modification in feed pipe and air suspension line for connecting 150 l auxiliary reservoir in lhb coaches with material at bdts coaching depot for a period of 06 months.
Read moreCustom bid for services - schedule a:passenger amenity attention for primary & secondary maintained coaches and ioh/ss i coahes at ccc/tpj depot for 69950 coaches for a period of 730 days including gst 18 percent,custom bid for services - schedule b: passenger amenity attention of other end attention (oea) at pf/tpj for 118990 coaches for a period of 730 days including gst 18 percent,custom bid for services - schedule c: passenger amenity attention for primary & secondary maintained coaches and ioh/ss i coaches at ccc/vm depot for 17760 coaches for a period of 730 days including gst 18 percent,custom bid for services - schedule d: passenger amenity attention of other end attention (oea) at pf/vm for 60590 coaches for period of two years including gst 18 percent,custom bid for services - schedule e:statutory liabilities epf, esi, bonus, pmsby and pmjjby - for 20 skilled and 8 unskilled labours at ccc/tpj and pf/tpj for a period of 730 days including gst 18 percent,custom bid for services - s
Custom bid for services - schedule a:passenger amenity attention for primary & secondary maintained coaches and ioh/ss i coahes at ccc/tpj depot for 69950 coaches for a period of 730 days including gst 18 percent,custom bid for services - schedule b: passenger amenity attention of other end attention (oea) at pf/tpj for 118990 coaches for a period of 730 days including gst 18 percent,custom bid for services - schedule c: passenger amenity attention for primary & secondary maintained coaches and ioh/ss i coaches at ccc/vm depot for 17760 coaches for a period of 730 days including gst 18 percent,custom bid for services - schedule d: passenger amenity attention of other end attention (oea) at pf/vm for 60590 coaches for period of two years including gst 18 percent,custom bid for services - schedule e:statutory liabilities epf, esi, bonus, pmsby and pmjjby - for 20 skilled and 8 unskilled labours at ccc/tpj and pf/tpj for a period of 730 days including gst 18 percent,custom bid for services - s
Read moreModification in 1st ac lhb coaches by provision of reverse mounting arrangement of sliding door in cabin-8 and relocation of npp-end intercommunication swing door at coaching depot indore and dadn.
Modification in 1st ac lhb coaches by provision of reverse mounting arrangement of sliding door in cabin-8 and relocation of npp-end intercommunication swing door at coaching depot indore and dadn.
Read moreof your Industry type