Tender Details
Particulars | Details |
---|---|
Title |
Constg. Anganwadi Building No 6 At Madansuri Tq. Nilanga Under D.P.D.C. Fund
|
Description |
Constg. Anganwadi Building No 6 At Madansuri Tq. Nilanga Under D.P.D.C. Fund
|
Organisation | RDD-CEO-LATUR | State Govt. and UT |
Tender Id | 2024_LATUR_1115561_1 |
Reference Number |
G.P./MDNSRI/ANG/141/2023-24 |
Tender Fee | 1000 |
EMD | 11046 |
Tender Value | |
Place | G.P. MADANSURI TQ. NILANGA |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1948128 |
Start Date | October 14, 2024 17:30 |
End Date |
16/10/2024 ( Expired 211 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreCa no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreProvision upgradation for fire safety services of old hangar (bldg no. p-17), lightning test facility hangar (bldg no. p-19), avionics (bldg no. p-36), aew and c building (bldg no. p-67) and stir building (bldg no. p-1) at cabs, bangalore
Provision upgradation for fire safety services of old hangar (bldg no. p-17), lightning test facility hangar (bldg no. p-19), avionics (bldg no. p-36), aew and c building (bldg no. p-67) and stir building (bldg no. p-1) at cabs, bangalore
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConst. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Read moreSpl repair to bldg no p-59 of mandir line at mcmm jabalpur under age b/r-i of ge (east) jabalpur
Spl repair to bldg no p-59 of mandir line at mcmm jabalpur under age b/r-i of ge (east) jabalpur
Read moreConstruction of additional foundations for 2 no 66kv line bay at 66kv s/s naugajja and 1 no 66kv line bay at 66kv s/s mustfapur
Construction of additional foundations for 2 no 66kv line bay at 66kv s/s naugajja and 1 no 66kv line bay at 66kv s/s mustfapur (under op. circle kapurthala) (twl no. 60/nz/2023-24/annex-b)
Read moreof your Industry type