Tender Details
Particulars | Details |
---|---|
Title |
Demolishing and reconstruction of community centre in village dichaon kalan in n g block ac 35
|
Description |
Demolishing and reconstruction of community centre in village dichaon kalan in n g block ac 35
|
Organisation | Irrigation and Flood Control | State Govt. and UT |
Tender Id | 2024_IFC_261587_1 |
Reference Number |
EE/CD-XIII/Acs./2024-25/30 |
Tender Fee | 0 |
EMD | 3.6 Lakh |
Tender Value | |
Place | Najafgarh |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343006 |
End Date |
05/09/2024 ( Expired 15 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Balance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Read moreConstruction and installation of 7 nos pump dug well (solar) along with solar water pumping system at gp- sardiha, mouza- chingurkasa (jl no.- 584) under jhargram block in the district of jhargram under dpmu-jhargram wbadmi project, phase-ii.
Construction and installation of 7 nos pump dug well (solar) along with solar water pumping system at gp- sardiha, mouza- chingurkasa (jl no.- 584) under jhargram block in the district of jhargram under dpmu-jhargram wbadmi project, phase-ii.
Read moreDesign and construction of 40 mtr span maj pmt bridge at km 23.5 over angropani nallah and 35 mtr span maj pmt bridge at km 27.75 over avapani nallah on open foundation with steel superstructure in arunachal pradesh state in epc mode
Design and construction of 40 mtr span maj pmt bridge at km 23.5 over angropani nallah and 35 mtr span maj pmt bridge at km 27.75 over avapani nallah on open foundation with steel superstructure in arunachal pradesh state in epc mode
Read moreCamc for johnson make lifts installed in faculty of dental sciences and psychiatry building, trauma centre premises, institute of medical sciences, bhu
Camc for johnson make lifts installed in faculty of dental sciences and psychiatry building, trauma centre premises, institute of medical sciences, bhu
Read moreDevelopment operation and maintenance of the mmlp pune at village pawalewadi maval taluka district pune in maharashtra through ppp on dbfot basis
Development operation and maintenance of the mmlp pune at village pawalewadi maval taluka district pune in maharashtra through ppp on dbfot basis
Read moreConstruction of new tail end regulator across vettar river at mile 92/0 in uthamacholapuram village in nagapattinam taluk and district
Construction of new tail end regulator across vettar river at mile 92/0 in uthamacholapuram village in nagapattinam taluk and district
Read moreSetting up of 3.5mw(ac) inhouse captive solar pv plant at iit hyderabad
Setting up of 3.5mw (ac) in-house captive solar pv plant at iit hyderabad campus which includes planning, design, supply, installation, testing and commissioning with 05years post commissioning operation and maintenance of plant
Read moreTnv-35 sivagiri h candm sub division
Widening from single lane to intermediate lane, strengthening, improvements to riding quality, providing junction improvement, reconstruction of culvert and retaining wall in government roads in sivagiri h c and m sub division tnv-35
Read moreRepair and protective work on both sides on small bridge located on kalyani river (saraiya bridge) at km 37.00 of itaunja mahona kumhrawan (odr) in block dewa district barabanki.
Repair and protective work on both sides on small bridge located on kalyani river (saraiya bridge) at km 37.00 of itaunja mahona kumhrawan (odr) in block dewa district barabanki.
Read moreFour laning of badvel to nellore section of nh-67 in the state of andhra pradesh on ham pkg-ii starting near bedusupalli village (ch.675.598) and ending near yeturu village (ch.705.048) with design length of 29.450 kms under nh(o)
Four laning of badvel to nellore section of nh-67 in the state of andhra pradesh on ham pkg-ii starting near bedusupalli village (ch.675.598) and ending near yeturu village (ch.705.048) with design length of 29.450 kms under nh(o)
Read moreNo attachments found
of your Industry type