Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Vibration Probe, Wl 142 K05 A M105152/Cpf (8199966371),Vibration Transmitter, 0 1 Ips, 4 Hz 2.5 Khz(817
|
| Description |
|
| Organisation | INDIAN OIL CORPORATION LIMITED | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2025/B/6004819 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 28, 2025 15:34 |
| End Date |
Expired
10/03/2025
Expired 453 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | AKV ENTERPRISE | Make : Schaeffler Model : Optime Sensor Title : VIBRATION PROBE, WL-142K05A-M105152/CPF (8199966371) | 09-03-2025 17:22:15 | N/A | Evaluated |
| 2 | CANOPUS ENGINEERING SERVICES | Make : Schaeffler Model : Optime AW5 Title : VIBRATION PROBE, WL-142K05A-M105152/CPF (8199966371) | 07-03-2025 17:53:55 | N/A | Evaluated |
| 3 | EIBC PRIVATE LIMITED | Make : SCHAEFFLER Model : VIBRATION Title : VIBRATION PROBE, WL-142K05A-M105152/CPF (8199966371) | 10-03-2025 14:01:41 | N/A | Evaluated |
Contract Details
- Contract Status:
- WaitingForPaymentConfirmation
- Seller:
- CANOPUS ENGINEERING SERVICES
- Buyer Designation:
- Assistant Manager
- Buying Mode:
- Bid/RA
- Contract Date:
- 2025-03-22 17:52:00 +0530
- Contract Amount:
- 507400
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| VIBRATION PROBE, WL-142K05A-M105152/CPF (8199966371) | Schaeffler | Optime AW5 | 8 | ₹ 424800.000 |
| VIBRATION TRANSMITTER, 0-1 IPS, 4HZ-2.5KHZ(8170283803) | Schaeffler | Treon Gateway 1111 | 1 | ₹ 82600.000 |
Job of camc for auto labelling machine of ocme 1 ltr filling line at wl
Job of camc for auto labelling machine of ocme 1 ltr filling line for a period of two years
Read moreConstruction of atal pragati path sh-75 to nuwaliya km 0/0 to 1/250.
Construction of atal pragati path sh-75 to nuwaliya km 0/0 to 1/250.
Read moreGeneral-mla ads 2025-26 improvements and providing 20mm close graded taring and concrete work thuruthalmukku- kaithakkodu indian bank road 0/000 to 1/700-general civil workgeneral civil work
General-mla ads 2025-26 improvements and providing 20mm close graded taring and concrete work thuruthalmukku- kaithakkodu indian bank road 0/000 to 1/700-general civil workgeneral civil work
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreGeneral budget work 2025 26 20 budget provision providing bm and bc to k a d a m b a n a d u m u d i p p u r a j n deshakkallumoodu sh road ch 0 000 to 1 7000 general general civil work 1
General budget work 2025 26 20 budget provision providing bm and bc to k a d a m b a n a d u m u d i p p u r a j n deshakkallumoodu sh road ch 0 000 to 1 7000 general general civil work 1
Read moreImprovement of bada bazar old nh-5 to via- brahmun dhamana street, odia dhamana street, sankha bandha, phd, old jayashree main road to potagada of ganjam nac from 0/329 km to 1/551 km
Improvement of bada bazar old nh-5 to via- brahmun dhamana street, odia dhamana street, sankha bandha, phd, old jayashree main road to potagada of ganjam nac from 0/329 km to 1/551 km
Read moreRestoration of lane and drain and others allied works in ward no. 1, 2, 3, 4, 5, 6, 7, 8 , 9, 14, 19 and 71 and gummat gate after demolition the existing compromised structure by way of re-ecting rcc protection walls upto height of 7-0 on both sid
Restoration of lane and drain and others allied works in ward no. 1, 2, 3, 4, 5, 6, 7, 8 , 9, 14, 19 and 71 and gummat gate after demolition the existing compromised structure by way of re-ecting rcc protection walls upto height of 7-0 on both sid
Read moreof your Industry type