Tender Details
Particulars | Details |
---|---|
Title |
Renewal And Restoration Of Road Cut Done By P.H.E.D For Bisalpur Pipe Line In Zone 8,Jda (Phase Ii) Part I
|
Description |
Renewal And Restoration Of Road Cut Done By P.H.E.D For Bisalpur Pipe Line In Zone 8,Jda (Phase Ii) Part I
|
Organisation | Jaipur Development Authority | State Govt. and UT |
Tender Id | 2025_JDAJP_443696_1 |
Reference Number |
EE-8/11-2024-25 |
Tender Fee | 3500 |
EMD | 13.65 Lakh |
Tender Value | |
Place | Bisalpur pipe line in Zone-8,JDA |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=797006 |
Start Date | January 20, 2025 15:00 |
End Date |
08/02/2025 ( Expired 121 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreEng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreCs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreRepair to internal road in zone-iii and adjacent area under age b/r-ii of ge (north) meerut cantt
Repair to internal road in zone-iii and adjacent area under age b/r-ii of ge (north) meerut cantt
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at jagatdihi zone-26 kulti under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at jagatdihi zone-26 kulti under amrut 2.0 phase-iii&#x0d within amc
Read moreProcurement of 300 nb and 250 nb cast basalt lined pipe line for installation in pressure conveying line of ash handling plant of unit no.10 and 11, stps sarni.
Procurement of 300 nb and 250 nb cast basalt lined pipe line for installation in pressure conveying line of ash handling plant of unit no. 10 and 11, stps sarni.
Read moreService part for renovation of ash slurry disposal pipe line by drc pipes and bends below culvert in residential area (sangrampur village etc.) outside plant under ahp-mm, bktpp under capex 2025-26
Service part for renovation of ash slurry disposal pipe line by drc pipes and bends below culvert in residential area (sangrampur village etc.) outside plant under ahp-mm, bktpp under capex 2025-26
Read moreof your Industry type