Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Four Legged Polyester Webbing Sling
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5646101 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | November 26, 2024 14:44 |
| End Date |
Expired
17/12/2024
Expired 555 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | BOMBAY LIFTWORKS PRIVATE LIMITED | Make : BLW Model : BLW Title : FOUR LEGGED POLYESTER WEBBING SLING | 10-12-2024 15:55:23 | MII MSE | Qualified |
| 2 | REPUBLIC HARDWARE STORES | Make : INDIGENOUS Model : AS PER SPECIFICATION Title : FOUR LEGGED POLYESTER WEBBING SLING | 28-11-2024 15:53:07 | MII | Qualified |
| 3 | SWASTIK ENTERPRISES | Make : SANKALP Model : SANKALP Title : FOUR LEGGED POLYESTER WEBBING SLING | 16-12-2024 13:33:46 | MII | Qualified |
| 4 | TRINITY INTERNATIONAL | Make : SIMPLEX Model : 4 LEGGED POLYESTER MULTILEG WEBBING SLING 12TON Title : FOUR LEGGED POLYESTER WEBBING SLING | 16-12-2024 18:02:47 | MII MSE | Qualified |
| 5 | VESTIA TECHNICAL SOLUTIONS LLP | Make : GARWARE TECHNICAL FIBRES LTD Model : FOUR LEGGED POLYESTER WEBBING SLING Title : FOUR LEGGED POLYESTER WEBBING SLING | 17-12-2024 01:00:02 | MII | Qualified |
Supply and installation of standalone servo-pneumatic four point bending (4pb) system
Supply and installation of standalone servo-pneumatic four point bending (4pb) system
Read moreHeavy duty round endless polyster sling of effective length 3 meters (circumfertial length of 6 meters) of 04ton capacity with testing certifiate.
For complete deion and other details, please refer to tender
Read moreFabrication and supply of four number atf fuel dispenser system for transferring atf oil from barrels to bowser.
Fabrication and supply of four number&#x0d atf fuel dispenser system for transferring atf oil from barrels to bowser.
Read moreHiring of 1 no. utility vehicles at g1 and g2 chowki for 4 (four) month for day to day work of ae (maint) ward
Hiring of 1 no. utility vehicles at g1 and g2 chowki for 4&#x0d (four) month for day to day work of ae (maint) ward
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDeposit-construction of four new septic tank and maintenance of existing septic tanks for all wards-construction of rcc septic tank for wards at govt. mental health centre, west fort thrissur-general civil work
Deposit-construction of four new septic tank&#x0d and maintenance of existing septic tanks for all&#x0d wards-construction of rcc septic tank for&#x0d wards at govt. mental health centre, west fort&#x0d thrissur-general civil work
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreFour laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Read moreEngagement of user fee agency through eq on (8 nos/11 nos) fee plazas (07 no fee plazas in the state of haryana and 04 no fee plaza in the state of punjab) for project four-lane greenfield delhi-amritsar-katra expressway (ne-5) on ham
Engagement of user fee agency through eq on (8 nos/11 nos) fee plazas (07 no fee plazas in the state of haryana and 04 no fee plaza in the state of punjab) for project four-lane greenfield delhi-amritsar-katra expressway (ne-5) on ham
Read moreof your Industry type