Renewal Of 80 Nb Dust Suppression Line With Sprinkler Assembly Along The Coal Yard On Both Sides Of Conveyor 9 Walkways And On The Compound Wall Of New Yard In Chp Area Of Mtps Ii
|
Description |
Renewal Of 80 Nb Dust Suppression Line With Sprinkler Assembly Along The Coal Yard On Both Sides Of Conveyor 9 Walkways And On The Compound Wall Of New Yard In Chp Area Of Mtps Ii
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_526889_1 |
Reference Number |
OT36/24-25 |
Tender Fee | 0 |
EMD | 30000 |
Tender Value | |
Place | MTPS-II / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=627381 |
Start Date | February 21, 2025 23:30 |
End Date |
10/03/2025 ( Expired 90 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i m ii circle oahs retrieving the accumulated ash over and under the 08 nos ash slurry pipe streams and removing piled ash on both sides of the ash slurry pipeline streams from b4 to uad area
Mtps i m ii circle oahs retrieving the accumulated ash over and under the 08 nos ash slurry pipe streams and removing piled ash on both sides of the ash slurry pipeline streams from b4 to uad area
Read moreRepairing replacement of both sides rear suspension assembly repairing of centrifugal pump along with repairing of operators cabin of water sprinkler ws28 ii mc sl no 28176 under ttk ocp rajhara area
Repairing replacement of both sides rear suspension assembly repairing of centrifugal pump along with repairing of operators cabin of water sprinkler ws28 ii mc sl no 28176 under ttk ocp rajhara area
Read moreOt40renewal of 80nb dust suppression line with sprinkler assembly along the coal yard on both sides of conveyor #9 walkways and on the compound wall of new yard in chp area of mtps-ii
Renewal of 80nb dust suppression line with sprinkler assembly along the coal yard on both sides of conveyor #9 walkways and on the compound wall of new yard in chp area of mtps-ii.
Read moreOt41 rerouting of coal yard dust suppression 150nb line from dust suppression (ds) pump house to jt-5, jt-5 to jt-4 and jt-4 to new yard compound wall above the ground and renewal of 80nb dust suppression line with sprinkler assembly along the coal y
Rerouting of coal yard dust suppression 150nb line from dust suppression (ds) pump house to jt-5, jt-5 to jt-4 and jt-4 to new yard compound wall above the ground and renewal of 80nb dust suppression line with sprinkler assembly along the coal yard o
Read moreDr.nttps-om-civil-clearing the light jungle in road no. 1 4, abc road, water treatment plant, fire station, both sides of compound wall from new gate to budameru near cooling towers via old gate areas 220kv switch yard bays empty bays and cleaning of storage tanks and sludge pits of bcw pump house stage-iii during the year 2025-26.
Dr.nttps-om-civil-clearing the light jungle in road no. 1 4, abc road, water treatment plant, fire station, both sides of compound wall from new gate to budameru near cooling towers via old gate areas 220kv switch yard bays empty bays and cleaning of storage tanks and sludge pits of bcw pump house stage-iii during the year 2025-26.
Read moreMtps i - civil circle - spreading and levelling the reject coal along road side of eastern compound wall (way to chinnakkavur drain from pcr ii) to avoid jungle growth at mtps i
Mtps i - civil circle - spreading and levelling the reject coal along road side of eastern compound wall (way to chinnakkavur drain from pcr ii) to avoid jungle growth at mtps i
Read moreIchp -clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north south sides of stacker-ii and reclaimer-ii machine travel path in conveyor-54.
Ichp -clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north south sides of stacker-ii and reclaimer-ii machine travel path in conveyor-54.
Read moreIchp -clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north , south sides of stacker-i and reclaimer-i machines travel path in conveyor-49
Ichp -clearing the slided and spilled coal along the walkways over&#x0d below deck sheets, between the track rails and outside the track rails both north , south sides&#x0d of stacker-i and reclaimer-i machines travel path in conveyor-49
Read moreEchpii clearing the coal coal dust and foreign materials daily on walkways of both side side under belt throughout conveyors deck sheet and tail end areas monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Echpii clearing the coal coal dust and foreign materials daily on walkways of both side side under belt throughout conveyors deck sheet and tail end areas monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Read moreRenewal of 80nb dust suppression line with sprinkler assembly along the coal yard on both sides of conveyor 9 walkways and on the compound wall of new yard in chp area of mtps-ii
Renewal of 80nb dust suppression line with sprinkler assembly along the coal yard on both sides of conveyor 9 walkways and on the compound wall of new yard in chp area of mtps-ii
Read moreof your Industry type