Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairment Of Lane From H/O Ali Mohd Dar To H/O Farooq
|
| Description |
Repairment Of Lane From H/O Ali Mohd Dar To H/O Farooq &Amp#X0d
Ahmad Bhat At Frestabal Umar Masjid Adjacent To Graveyard &Amp#X0d
At Mc Pampore.
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWDJK_272694_1 |
|
Reference Number |
Fresh- 144 /EEA/RNB of 2024-25/10063-73 DATED 17/02/2025 |
| Tender Fee | 200 |
| EMD | 5460 |
| Tender Value | |
| Place | pampore |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=842464 |
| Start Date | February 17, 2025 21:30 |
| End Date |
Expired
24/02/2025
Expired 491 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Const. of c. c road and drain from h/o ranvir shakya to h/o devendra pal in village devinagar (g.p. devinagar) mainpuri.
Const. of c. c road and drain from h/o ranvir shakya to h/o devendra pal in village devinagar (g.p. devinagar) mainpuri.
Read moreImp./dev. of road from h.no.i-1 to i-5, h-1 to h-4 and j-1 to j-7 in aruna nagar by providing rmc in ward no. 73, civil lines, city-sp zone.
Imp./dev. of road from h.no.i-1 to i-5, h-1 to h-4 and j-1 to j-7 in aruna nagar by providing rmc in ward no. 73, civil lines, city-sp zone.
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreDevelopment of road and side lane gali bombay chowk to prajapati chowk by providing rmc in ward no. 77, delhi gate, city-sp zone.
Development of road and side lane gali bombay chowk to prajapati chowk by providing rmc in ward no. 77, delhi gate, city-sp zone.
Read moreConcession to supply install test commission and operate automated vehicle parking management system collection of parking fees and lane pickup fees rights at silchar airport
Concession to supply install test commission and operate automated vehicle parking management system collection of parking fees and lane pickup fees rights at silchar airport
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreMacadamization of road from khurmang to leeran km 3rd to onwards
Macadamization of road from khurmang to leeran km 3rd to onwards
Read more90.construction of cc road, drain, and slab from sonu house to vishnu general store, from lalu house to umesh house, and from shivnath house to sarnam house in mohalla ramnagar.
90.construction of cc road, drain, and slab from sonu house to vishnu general store, from lalu house to umesh house, and from shivnath house to sarnam house in mohalla ramnagar.
Read moreC/o ors accommodation, stable and training shed at camp of 48 bn itbp at an altitude of 12600 feet and a distance of approx. 18 km from chungthang, distt-mangan, north sikkim connected with road and further approx. 9 km on foot from nearest roadhead
C/o ors accommodation, stable and training shed at camp of 48 bn itbp at an altitude of 12600 feet and a distance of approx. 18 km from chungthang, distt-mangan, north sikkim connected with road and further approx. 9 km on foot from nearest roadhead
Read moreof your Industry type