Tender Details

Particulars Details
Title
Construction Of Repair And Lepan Work At Kurda Pitch Road Se Pokharhwa Gaon Tak Block Gaur Distt Basti. . (Sansad Nidhi Basti)
Description
Construction Of Repair And Lepan Work At Kurda Pitch Road Se Pokharhwa Gaon Tak Block Gaur Distt Basti. . (Sansad Nidhi Basti)
Organisation U.P. State Construction and Infrastructure Development Corporation Ltd. | State Govt. and UT
Tender Id 2025_SCIDC_998354_1
Reference
Number
6046 /EE Basti /E-Tender /sansad Nidhi Basti /2024-25 Dated 25-01-2025
Tender Fee 1300
EMD 28000
Tender Value
Place Basti
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1809860
Start Date February 22, 2025 14:30
End Date

27/02/2025 ( Expired 122 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Read more
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b

Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b

Read more
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a

Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Read more
Construction of road and drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase

Construction of road and drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase

Read more
Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.

Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.

Read more
Construction of rcc drain cover and paver block at ward no.42 district sahkari central bank to hariram shah house

Construction of rcc drain cover and paver block at ward no.42 district sahkari central bank to hariram shah house

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise