Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
11 Kv/ Lt Line Shifting Of 11 Kv Under Edd Harraiya Basti Pradhanmantri Gram Sadak Yojna
|
| Description |
11 Kv/ Lt Line Shifting Of 11 Kv Under Edd Harraiya Basti Pradhanmantri Gram Sadak Yojna
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNV_819369_1 |
|
Reference Number |
25/EDC(B)/2023-24 |
| Tender Fee | 2360 |
| EMD | 18000 |
| Tender Value | - |
| Place | BASTI |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | July 10, 2023 23:30 |
| End Date |
Expired
25/07/2023
Expired 1178 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Various work under deposit head 2026 27 under edd harraiya basti
Various work under deposit head 2026 27 under edd harraiya basti
Read moreWork for shifting of 11 kv lines and lt line during road widening from bakerganj to lucknow by pass under edd fatehpur
Work for shifting of 11 kv lines and lt line during road widening from bakerganj to lucknow by pass under edd fatehpur
Read moreGram sabha sirihira sakalpur marg se pradhanmantri sadak tak patch marmmat karya
Gram sabha sirihira sakalpur marg se pradhanmantri sadak tak patch marmmat karya
Read moreConstruction of toilet blocks at kasturba gandhi balika vidyalaya in harraiya and vikramjot distt- basti
Construction of toilet blocks at kasturba gandhi balika vidyalaya in harraiya and vikramjot distt- basti
Read moreWork of repair and overhauling of vcb panel under executive engineer electricity distribution division harraiya basti
Work of repair and overhauling of vcb panel under executive engineer electricity distribution division harraiya basti
Read moreShifting 11 kv line lt line for road widening work from rr tower to kati ghati distt.gwlior
Shifting 11 kv line lt line for road widening work from rr tower to kati ghati distt.gwlior
Read moreShifting of 11 kv oh line
Shifting of 11 kv overhead line at khamariya village behind mata karma college at rehabilitated village under rnr policy are crossing between a plot area creating hindrance for rehabilitated village work under township kusmunda area.
Read moreGram panchayat gulhariya gazipur me pradhanmantri sadak se gadariyanpurwa lodhanpurwa marg par lepan marammat karya. (block kaisarganj) (0.403 km.)
Gram panchayat gulhariya gazipur me pradhanmantri sadak se gadariyanpurwa lodhanpurwa marg par lepan marammat karya. (block kaisarganj) (0.403 km.)
Read moreof your Industry type