Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Es Circle Mrt I Part Of Maintenance Works Related To Controls Protection In Unit I Ii Iii Pertaining To Sub Division Ii Of Mrt Division 1 For The Period From 01 04 2026 To 31 03 2027
|
| Description |
Ttps Es Circle Mrt I Part Of Maintenance Works Related To Controls Protection In Unit I Ii Iii Pertaining To Sub Division Ii Of Mrt Division 1 For The Period From 01 04 2026 To 31 03 2027
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_632558_1 |
|
Reference Number |
CE/SE/ES/TTPS/No.02/2026-27 |
| Tender Fee | 0 |
| EMD | 9100 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=756750 |
| Start Date | December 16, 2025 19:30 |
| End Date |
Expired
31/12/2025
Expired 286 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps es circle mrt ii annual overhauling works in unit iv for the year 2026 2027 for fsss system subdivision 3 mrt ii ttps
Ttps es circle mrt ii annual overhauling works in unit iv for the year 2026 2027 for fsss system subdivision 3 mrt ii ttps
Read moreTtps es circle mrt ii annual overhauling works in unit iv for the year 2026 2027 for ba sbc section subdivision iii mrt ii ttps
Ttps es circle mrt ii annual overhauling works in unit iv for the year 2026 2027 for ba sbc section subdivision iii mrt ii ttps
Read moreTtps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit iv capital overhaul 2026 2027
Ttps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit iv capital overhaul 2026 2027
Read moreTtps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during capital annual overhaul of unit iv for the year 2026 2027
Ttps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during capital annual overhaul of unit iv for the year 2026 2027
Read moreTtps es circle mrt ii annual overhauling works in respect of turbine auxiliaries system in unit iv annual overhauling period for the year 2026 27
Ttps es circle mrt ii annual overhauling works in respect of turbine auxiliaries system in unit iv annual overhauling period for the year 2026 27
Read moreTtps es circle instn ii overhauling of 48 nos sadc cylinder positioners and air lock relays 78 nos of instruments pertaining to sadc heavy oil prds and soot blower systems 4 nos burner tilt cylinders 14 nos of instruments pertaining to burner tilt
Ttps es circle instn ii overhauling of 48 nos sadc cylinder positioners and air lock relays 78 nos of instruments pertaining to sadc heavy oil prds and soot blower systems 4 nos burner tilt cylinders 14 nos of instruments pertaining to burner tilt
Read moreSupply of contract jeep with driver for the use of es erumely (01/11/2026-31/10/2027)
Supply of contract jeep with driver for the use of es erumely 01/11/2026-31/10/2027)
Read moreTtps es circle em ii retrofitting of 3 nos 3200 amps lt air circuit breakers in esp i ii iii
Ttps es circle em ii retrofitting of 3 nos 3200 amps lt air circuit breakers in esp i ii iii
Read moreTtps es circle em ii erection and commissioning of 2 nos esp high voltage rectifier transformer in esp iii at unit iii
Ttps es circle em ii erection and commissioning of 2 nos esp high voltage rectifier transformer in esp iii at unit iii
Read moreTtps es circle instn ii overhaul of sample coolers and other related works and painting of wet panels and replacement of 6 nos worn out half ss globe valves during the annual overhaul for the year 2026 27 in unit iv
Ttps es circle instn ii overhaul of sample coolers and other related works and painting of wet panels and replacement of 6 nos worn out half ss globe valves during the annual overhaul for the year 2026 27 in unit iv
Read moreof your Industry type