Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Existing Duplex Strainer Buckets By New Ones Including Overhauling Of Flushing Valves/Air Release Valves
|
| Description |
Replacement Of Existing Duplex Strainer Buckets By New Ones Including Overhauling Of Flushing Valves/Air Release Valves
|
| Organisation | JKSPDC | State Govt. and UT |
| Tender Id | 2024_SPDC_259180_1 |
|
Reference Number |
USHP-II/GD/10 of 2024-25 |
| Tender Fee | 500 |
| EMD | 7000 |
| Tender Value | - |
| Place | Kangan, Ganderbal |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=765740 |
| Start Date | October 17, 2024 15:30 |
| End Date |
Expired
29/10/2024
Expired 719 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling of flushing apparatus jetting nozzles, valves, nozzle etc of esp system during annual overhauling of unit # 2, 3x210 mw, atps, anp..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling of flushing apparatus jetting nozzles, valves, nozzle etc of esp system during annual overhauling of unit # 2, 3x210 mw, atps, anp..
Read moreCustom bid for services - overhauling servicing of hp lp valves safety valves and actuators including replacement of hp drip drain line pipes of unit no 10 3x200mw btps obra sonebhadra
Custom bid for services - overhauling servicing of hp lp valves safety valves and actuators including replacement of hp drip drain line pipes of unit no 10 3x200mw btps obra sonebhadra
Read moreNctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreNctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreInstallation of overhead crane dsl line replacement of existing crane electrical conducting system dsl to shrouded busbar system at shed 7 details scope of work attached as per annexure i,refurbisment and realingnment of crane rail line details scope of work attached as per annexure i work will at shed-7,checking and certification of existing structure of eot crane inspection repair checking certification of existing crane supporting structure for both eot crane at shed 7,overhauling of eot crane overhauling of 20 and 5ton crane at shed 7 45 and 10 ton crane at shed7 details scope of work attached as per annexure i,incorporation of radio remote system in eot crane required for 45and10ton crane at shed7 radio remote sytem with existing cabin operated system scope of work as per annexure i
Installation of overhead crane dsl line replacement of existing crane electrical conducting system dsl to shrouded busbar system at shed 7 details scope of work attached as per annexure i,refurbisment and realingnment of crane rail line details scope of work attached as per annexure i work will at shed-7,checking and certification of existing structure of eot crane inspection repair checking certification of existing crane supporting structure for both eot crane at shed 7,overhauling of eot crane overhauling of 20 and 5ton crane at shed 7 45 and 10 ton crane at shed7 details scope of work attached as per annexure i,incorporation of radio remote system in eot crane required for 45and10ton crane at shed7 radio remote sytem with existing cabin operated system scope of work as per annexure i
Read moreOperation and maintenance services preventive and breakdown for first year,operation and maintenance services preventive and breakdown for second year,supply and replacement of existing 100mm dia pressure guages,supply and replacement of existing v belt of air blower,dismantling overhauling and servicing of all type of centrifugal pumpsets upto 2 hp,dismantling overhauling and servicing of all type of centrifugal pumpsets above 2hp upto 5hp,dismantling lifting lowering painting and re installation upto 2 hp,dismantling lifting lowering painting and re installation above 2hp upto 5hp,dismantling overhauling and servicing of all type of hydro pneumatic system 2.5 hp,dismantling overhauling and servicing of all type of hydro pneumatic system 5.5 hp,rewinding of following capacity blower motor 20hp motor,rewinding of following capacity blower motor 3hp motor,supply of industrial salt,supply of poly electrolyte,supply of sodium hypo chlorite,supply of alum,supply of lime,supply of gear oil for air-compressor,suppl
Operation and maintenance services preventive and breakdown for first year,operation and maintenance services preventive and breakdown for second year,supply and replacement of existing 100mm dia pressure guages,supply and replacement of existing v belt of air blower,dismantling overhauling and servicing of all type of centrifugal pumpsets upto 2 hp,dismantling overhauling and servicing of all type of centrifugal pumpsets above 2hp upto 5hp,dismantling lifting lowering painting and re installation upto 2 hp,dismantling lifting lowering painting and re installation above 2hp upto 5hp,dismantling overhauling and servicing of all type of hydro pneumatic system 2.5 hp,dismantling overhauling and servicing of all type of hydro pneumatic system 5.5 hp,rewinding of following capacity blower motor 20hp motor,rewinding of following capacity blower motor 3hp motor,supply of industrial salt,supply of poly electrolyte,supply of sodium hypo chlorite,supply of alum,supply of lime,supply of gear oil for air-compressor,suppl
Read moreSitc of 4.0 kw jockey pump with motor,sitc of automatic fire pump control panel for 4 pumps,sitc of pressure gauge,sitc of ul fm approved pressure switch,refixing, tc of existing air vessel,sitc of double flanged sluice valves pn 16,sitc of swing check nrv pn 16,sitc of cast iron bucket type strainer 80 mm,sitc of gear-operated dual plate nrv 80 mm pn 16,sitc of lockable butterfly valves pn 16,sitc of class-c heavy-duty ms fire hydrant piping,fabrication, installation of structural steel supports,sitc of pressure relief valve with delivery header,sitc of single-headed stainless-steel landing valve,sitc of double-headed stainless-steel landing valve,sitc of stainless-steel branch pipe with gun metal nozzle,sitc of 5x type low expansion foam branch,sitc of nfpa 1964 compliant jet fire nozzle,sitc of rrl fire hose with couplings,sitc of first aid hose reel with 30 m tph,sitc of automatic air release valve 25 mm,sitc of brass ball valve 25 mm,modification extension of existing fh piping,sitc of gi earthing strip
Sitc of 4.0 kw jockey pump with motor,sitc of automatic fire pump control panel for 4 pumps,sitc of pressure gauge,sitc of ul fm approved pressure switch,refixing, tc of existing air vessel,sitc of double flanged sluice valves pn 16,sitc of swing check nrv pn 16,sitc of cast iron bucket type strainer 80 mm,sitc of gear-operated dual plate nrv 80 mm pn 16,sitc of lockable butterfly valves pn 16,sitc of class-c heavy-duty ms fire hydrant piping,fabrication, installation of structural steel supports,sitc of pressure relief valve with delivery header,sitc of single-headed stainless-steel landing valve,sitc of double-headed stainless-steel landing valve,sitc of stainless-steel branch pipe with gun metal nozzle,sitc of 5x type low expansion foam branch,sitc of nfpa 1964 compliant jet fire nozzle,sitc of rrl fire hose with couplings,sitc of first aid hose reel with 30 m tph,sitc of automatic air release valve 25 mm,sitc of brass ball valve 25 mm,modification extension of existing fh piping,sitc of gi earthing strip
Read moreReplacement of existing key tag power contactors with new ones in vishnunivasam pac, tirupati
Replacement of existing key tag power contactors with new ones in vishnunivasam pac, tirupati
Read moreThe work of replacement of existing false ceiling with new ones in opd building at rajawadi hospital
The work of replacement of existing false ceiling with new ones in opd building at rajawadi hospital
Read moreSupply, installation, testing and commissioning of control valves as a replacement for damaged ones at water supply scheme upper khimber.
Supply, installation, testing and commissioning of control valves as a replacement for damaged ones at water supply scheme upper khimber.
Read moreof your Industry type