Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
R.U.P.V. Four Walls Of Ganeshpura Playground Ganeshpura Junda
|
Description |
R.U.P.V. Four Walls Of Ganeshpura Playground Ganeshpura Junda&Amp#X0d
&Amp#X0d
|
Organisation | Panchayati Raj Department | State Govt. and UT |
Tender Id | 2024_PRD_433378_1 |
Reference Number |
34/26-11-20214 |
Tender Fee | 1000 |
EMD | 14000 |
Tender Value | |
Place | GP Junda |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=778807 |
Start Date | November 29, 2024 16:30 |
End Date |
09/12/2024 ( Expired 207 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Licensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Licensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical 
 college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Read moreIe services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreRehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Read moreWidening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreHiring services of one no. new vehicle diesel driven, bs vi or latest compliance, brand mahindra bolero model b 4 base model or equivalent 2 wheeled drive under ps6, bongaigaon for row patrolling and other operational duties for a period of four years
Hiring services of one no. new vehicle diesel driven, bs vi or latest compliance, brand mahindra bolero model b 4 base model or equivalent 2 wheeled drive under ps6, bongaigaon for row patrolling and other operational duties for a period of four years
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type