Tender Details

Particulars Details
Title
Seamless Steel Tube 20 Mnm Bore Heavy Duty With Plain End In Length Of 5 To 7 Meters To Is 1239 (Part ): 2004 With Amndt. No. 4
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106554329
Reference
Number
26240496
Tender Fee 0
EMD 0
Tender Value
Place Gorakhpur
Link https://www.ireps.gov.in/ireps/supply/pdfdocs/012025/106554329/viewNitPdf_4807103.pdf
Start Date December 16, 2024 21:50
End Date

08/01/2025 ( Expired 102 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap (6) cylinder with brass line

Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap&amp#x0d (6) cylinder with brass line

Read more
Construction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham

Construction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham

Read more
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham

Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham

Read more
Provision of 3 nos. new tube well bore by suitable method prescribed in is 2800 part i in sector - 7 ward no. 34 old faridabad.

Provision of 3 nos. new tube well bore by suitable method prescribed in is 2800 part i in sector - 7 ward no. 34 old faridabad.

Read more
Provision of 4 nos. tube-wells bore by dth machine with machinery at various locations in ward no.20, faridabad.

Provision of 4 nos. tube-wells bore by dth machine with machinery at various locations in ward no.20, faridabad.

Read more
Pbmc for bhokar to sarsam section from km 0.000 to km 33.000 and kundral to wazar section from km 52.730 to 99.250 of nh 161a total project length 75.69 km having 2l with paved shoulder and 4 lane in state of maharashtra for 5 year maintenance period

Pbmc for bhokar to sarsam section from km 0.000 to km 33.000 and kundral to wazar section from km 52.730 to 99.250 of nh 161a total project length 75.69 km having 2l with paved shoulder and 4 lane in state of maharashtra for 5 year maintenance period

Read more
Erection of 7 span of ht oh line (3.3 kv) as extension of feeder no.-5 for provision of power to face pump at departmental patch (2) erection of 4 span ht oh line(3.3 kv) as extension of feeder no-1 for provision of power to excavators in department

Erection of 7 span of ht oh line (3.3 kv) as extension of feeder no.-5 for provision of power to face pump at departmental patch (2) erection of 4 span ht oh line(3.3 kv) as extension of feeder no-1 for provision of power to excavators in department

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise