Tender Details
Particulars | Details |
---|---|
Title |
Tower Package Tw32 B For Balance Work Of Tower Package A Tw27 Multi Circuit Mc Portion Of I 132k V Sc On Dc Towers Naharlagun Sagalee Tl Ii 132k V Sc On Dc Towers Naharlagun Banderdewa Tl And Iii 132k V Sc On Dc Towers Naharlagun Gerumukh Tl And B Tw08 132k V Sc On Dc Towers Naharlagun Sagalee Tl Associated With Comprehensive Scheme For Transmission System Strengthening Of Arunachal Pradesh Rfx No 5002003983
|
Description |
Package Tw32 B For Construction Of Balance Works Of Tower Packages Tw08 And Tw27 Under Comprehensive Scheme For Strengthening Of Transmission And Distribution System In Arunachal Pradesh
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id | 24828 |
Reference Number |
CC/NT/W-TW/DOM/A04/24/14398 |
Tender Fee | 25000 |
EMD | 0 |
Tender Value | |
Place | Arunachal Pradesh |
Link | https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=d87059ca-bbba-4a48-bba9-b70596334dd9 |
Start Date | October 25, 2024 22:24 |
End Date |
27/12/2024 ( Expired 116 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Detailed engineering, design, manufacture, supply, erection, testing and commissioning of 400 kv dc line on mc towers with twin htls conductor by converting existing 230kv sc line on sc tower with kundha conductor on ph3-karamadai loc 57-82 -reach-ii
Detailed engineering, design, manufacture, supply, erection, testing and commissioning of 400 kv dc line on mc towers with twin htls conductor by converting existing 230kv sc line on sc tower with kundha conductor on ph3-karamadai loc 57-82 -reach-ii
Read moreDetailed engineering, design, manufacture, supply, erection,testing commissioning of 400kv dc line on mc towers with twin htls conductor by converting existing 230kv sc line on sc tower with kundha conductor on ph3-karamadai loc 82- 105 (reach-iii)
Detailed engineering, design, manufacture, supply, erection,testing commissioning of 400kv dc line on mc towers with twin htls conductor by converting existing 230kv sc line on sc tower with kundha conductor on ph3-karamadai loc 82- 105 (reach-iii)
Read moreSupply, erection, testing and commissioning of i) 2nd circuit stringing on existing 132kv dc/sc line (30km) from 220/132kv budidampadu ss to 132/33kv yellandu ss ii) 1no. 132kv bay at 220/132kv ss budidampadu and iii) 1no. 132kv bay at 132kv ss yellandu in khammam district on turnkey basis
Supply, erection, testing and commissioning of i) 2nd circuit stringing on existing 132kv dc/sc line (30 km) from 220/132kv budidampadu ss to 132/33kv yellandu ss, ii) 1no 132kv bay at 220/132kv ss budidampadu and iii) 1no 132kv bay at 132kv ss yellandu in khammam district on turnkey basis.
Read moreAdditional works at existing 132/33 kv daporijo substation against bay augmentation work of 132/33 kv daporijo substation under arp-ss-05 package under comprehensive scheme for strengthening of transmission & distribution system in arunachal pradesh
Additional works of 33kv indoor switchgears gis type, termination of two nos. 33kv line bays, termination of 132kv daporijo-nacho line bays (to be initially charged at 33kv level) and relocation of station lt transformer at 132/33kv daporijo substation under comprehensive scheme arunachal pradesh.
Read moreTower package tw32b for balance work of tower package atw27 multi circuit mc portion of i 132kv sc on dc towers naharlagun sagalee tl ii 132kv sc on dc towers naharlagun banderdewa tl and iii 132kv sc on dc towers naharlagun gerumukh tl and btw08 132kv sc on dc towers naharlagun sagalee tl associated with comprehensive scheme for transmission system strengthening of arunachal pradesh rfx no 5002003983
Package tw32b for construction of balance works of tower packages tw08 and tw27 under comprehensive scheme for strengthening of transmission and distribution system in arunachal pradesh
Read moreLaying of tower foundations, erection of towers, stringing and sagging of conductor for lilo of ckt no. 1 of 220 kv rsd sarna line at 220 kv shahpur kandi power house-i to power house-ii (from tl no. 49-56) sc on dc line
Laying of tower foundations, erection of towers, stringing and sagging of conductor for lilo of ckt no. 1 of 220 kv rsd sarna line at 220 kv shahpur kandi power house-i to power house-ii (from tl no. 49-56) sc on dc line
Read moreDesign, testing, manufacture, supply and stringing of high temperature low sag conductor (htls) except gap conductor alongwith associated hardware fittings on new transmission line or destring replacement of existing acsr conductor on sc or dc or mc
Design, testing, manufacture, supply and stringing of high temperature low sag conductor (htls) except gap conductor alongwith associated hardware fittings on new transmission line or destring replacement of existing acsr conductor on sc or dc or mc
Read moreConstruction of 132 kv sc line on dc tower from 132kv s/s saidpur to 132kv s/s kaithi under electricity transmission division-i, varanasi
Construction of 132 kv sc line on dc tower from 132kv s/s saidpur to 132kv s/s kaithi under electricity transmission division-i, varanasi
Read moreof your Industry type