Tender Details
About Tender
🚂 Invitation For Bids: Track Machine Siding Works At Oddanchatram And Palani Stations 🛠️🚇 The Ministry Of Railways, Central Government, Invites Bids For The Provision Of Track Machine Siding At Oddanchatram And Palani Stations Within The Aden/Dindigul Section. 🗺️ 📅 Bid Submission Deadline: May 22, 2024, 2:00 Pm A Tender Fee Of Inr 3,12,200 Is Applicable As Earnest Money Deposit (Emd). Interested Bidders Must Meticulously Review The Complete Tender Document For Detailed Specifications, Scope Of Work, And Submission Guidelines. Keywords: Ministry Of Railways, Track Machine Siding, Infrastructure Works, Government Tender, Emd, Bid Submission, Oddanchatram, Palani, Aden/Dindigul SectionParticulars | Details |
---|---|
Title |
Madurai Division: Den/North Jurisdiction: : Provision Of Track Machine Siding At
Oddanchatram And Palani Stations In Aden/Dindigul Section.( Works And Bridge Portion
Only)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74453535 |
Reference Number |
MDU-W-07-2024-06 |
Tender Fee | 0 |
EMD | 3.12 Lakh |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74453535/viewNitPdf_4526274.pdf |
Start Date | April 30, 2024 20:43 |
End Date |
22/05/2024 ( Expired 356 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provision of deficient otm accomommodation and associated works for mt and mtr and s section at air force station tezpur
Provision of deficient otm accomommodation and associated works for mt and mtr and s section at air force station tezpur
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreRenewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Read moreProvision of addition / alteration and renovation works in ganga building no. 121 at dlrl, hyderabad
Provision of addition / alteration and renovation works in ganga building no. 121 at dlrl, hyderabad
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreRectification of accident spots by construction of lvup at km 26.530 and service road in oddanchatram bypass section of nh-83 (nh-209) in the state of tamil nadu (3rd call)
Rectification of accident spots by construction of lvup at km 26.530 and service road in oddanchatram bypass section of nh-83 (nh-209) in the state of tamil nadu (3rd call)
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreof your Industry type