Tender Details

Particulars Details
Title
Repairing Of Steering System Lhs Of Bd 355 Dozer Sl. No. 11996 At Nakc Ocp Of Govindpur Area Iii, Bccl.
Description
Please Refer Annexure B In Tender Document
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_325942_1
Reference
Number
BCCL/GA-III/EXC/E TENDER/24-25/83 DATE-16.01.2025
Tender Fee 0
EMD 1142
Tender Value
Place NAKOCP,GOVINDPUR AREA-3,BCCL DHANBAD
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337853

Start Date January 17, 2025 14:30
End Date
Expired 28/01/2025

Expired 498 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Towards repairing of cracked equalizer bar, pin and cabin legs of bd355 dozer sl. no. 12068 working at lajkura ocp.

Towards repairing of cracked equalizer bar, pin and cabin legs of bd355 dozer sl. no. 12068 working at lajkura ocp.

Read more
Rep./ overhauling of andrew yule make field switch 400amp., 3.3 kv and rep. of magnetic amplifier block assembly (02 nos.) of ekg shovel sl. no. hmb 578 at asbn ocp, sijua area

Rep./ overhauling of andrew yule make field switch 400amp., 3.3&#x0d kv and rep. of magnetic amplifier block assembly (02 nos.) of ekg shovel sl. no. hmb 578 at asbn ocp, sijua area

Read more
Repairing of carrier pin assy of beml bh60m dumpers sl. no- 60887 and 60890 deployed at socp

Repairing of carrier pin assy of beml bh60m dumpers sl. no- 60887 and 60890 deployed at socp

Read more
Wbphed/ee/maad/niet _01 of 2026-2027. sl. no. 01

Water supply and drainage work including construction and installation of water filtration system on 2nd floor, pvc pipes at existing state seed testing lab malda under malda arsenic area water supply division, p.h.e dte.

Read more
Nieq 2 of 2026-27, sl no. 2, preparation and submission of detailed project report (dpr), drawing, design, boq etc. in connection with the fire fighting system at- ambari falakata ip, phase-ii. (38.60 acre approx.) (3rd call)

Preparation and submission of detailed project report (dpr), drawing, design, boq etc. in connection with the fire fighting system at- ambari falakata ip, phase-ii. (38.60 acre approx.) (3rd call)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise