Tender Details
Particulars | Details |
---|---|
Title |
Gap Filling And Activity Work At Vill Urbara Block Kabrai, Mahoba (Under Scheme Pmagy)
|
Description |
Gap Filling And Activity Work At Vill Urbara Block Kabrai, Mahoba (Under Scheme Pmagy)
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_SCIDC_820410_1 |
Reference Number |
33/EE/Mahoba/Orai/ET/2023-24 |
Tender Fee | 1300 |
EMD | 32500 |
Tender Value | |
Place | ORAI Jalaun |
Link | https://etender.up.nic.in |
Start Date | July 14, 2023 16:30 |
End Date |
25/07/2023 ( Expired 665 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreTsgp-31/ rdss/2025-26
Development of distribution infrastructure of 11 kv feeders (urban and industrial) emanating from 66 kv sub-stations sector 1,2,3,4,8 in imt manesar of gurugram-1 circle, dhbvn under rds scheme.
Read moreAAAAAAAAAA
Login to viewDevelopment of distribution infrastructure of 11 kv feeders&#x0d (urban and industrial) emanating from 66 kv sub-stations pali, fci dhoj of faridabad circle, dhbvn under revamped&#x0d reforms-based and results-linked, distribution sector&#x0d scheme.
Read moreAAAAAAAAAA
Login to viewDevelopment of distribution infrastructure of 11 kv feeders&#x0d (urban and industrial) emanating from 66 kv sub-stations sector&#x0d 46, 21d, nh3 of faridabad circle, dhbvn under revamped&#x0d reforms-based and results-linked, distribution sector&#x0d scheme
Read moreAAAAAAAAAA
Login to viewDevelopment of distribution infrastructure of 11 kv feeders (urban and industrial) emanating from 66 kv sub-stations sector-58, orient steel of faridabad circle, dhbvn under revamped reforms-based and results-linked, distribution sector scheme
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreof your Industry type