Tender Details

Particulars Details
Title
Renovation Of Dhs At P.N. Complex, Gurkhabasti During The Year 2024 To 25 At Top Floor.
Description
Renovation Of Dhs At P.N. Complex, Gurkhabasti During The Year 2024 To 25.
Organisation State Health and Family Welfare Society | State Govt. and UT
Tender Id 2024_NRHM_55990_1
Reference
Number
EE(Engg Cell)/NHM/DNIT/09/2024-25
Tender Fee 1000
EMD 12856
Tender Value -
Place AGARTALA
Link
View Original Tender Notice

https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=56892

Start Date December 18, 2024 22:30
End Date
Expired 31/12/2024

Expired 650 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Changes to be made for executive engineer office of masab tank at 5th floor in abids parking complex in circle-30, gz, ghmc for administrative works (rs. 12.10 lakhs)

Changes to be made for executive engineer office of masab tank at 5th floor in abids parking complex in circle-30, gz, ghmc for administrative works (rs. 12.10 lakhs)

Read more
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
Construction of meeting hall on 6th floor with puf panel sheet roofing of newly constructed tgspdcl (g+5 floors) building located at the extreme south-west corner outside the secretariat complex premises, mint compound, hyderabad (reserved for st category)

Construction of meeting hall on 6th floor with puf panel sheet roofing of newly constructed tgspdcl (g+5 floors) building located at the extreme south-west corner outside the secretariat complex premises, mint compound, hyderabad (reserved for st category)

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Renovation of dhs at p.n. complex,gurkhabasti during the year 2025 to26

Renovation of dhs at p.n. complex,gurkhabasti during the year &amp#x0d 2025 to26, repair and maintenance of existing vacant room &amp#x0d no 101 and 102 and attached garage room for establishment of new &amp#x0d office canteen and record room at ground floor of the dhs

Read more
Renovation of dhs at p.n. complex, gurkhabasti during the year 2024 to 25 at third floor.

Renovation of dhs at p.n. complex, gurkhabasti during the year 2024 to 25.

Read more
Renovation of dhs at p.n. complex, gurkhabasti during the year 2025 to 26

Renovation of dhs at p.n. complex, gurkhabasti during the year 2025 to 26

Read more
Renovation of office building of dfwpm at p.n. complex, gurkhabasti during the year 2024 to 25.

Renovation of office building of dfwpm at p.n. complex, gurkhabasti during the year 2024 to 25.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise