Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Of Dhs At P.N. Complex, Gurkhabasti During The Year 2024 To 25 At Top Floor.
|
| Description |
Renovation Of Dhs At P.N. Complex, Gurkhabasti During The Year 2024 To 25.
|
| Organisation | State Health and Family Welfare Society | State Govt. and UT |
| Tender Id | 2024_NRHM_55990_1 |
|
Reference Number |
EE(Engg Cell)/NHM/DNIT/09/2024-25 |
| Tender Fee | 1000 |
| EMD | 12856 |
| Tender Value | - |
| Place | AGARTALA |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=56892 |
| Start Date | December 18, 2024 22:30 |
| End Date |
Expired
31/12/2024
Expired 650 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Changes to be made for executive engineer office of masab tank at 5th floor in abids parking complex in circle-30, gz, ghmc for administrative works (rs. 12.10 lakhs)
Changes to be made for executive engineer office of masab tank at 5th floor in abids parking complex in circle-30, gz, ghmc for administrative works (rs. 12.10 lakhs)
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreConstruction of meeting hall on 6th floor with puf panel sheet roofing of newly constructed tgspdcl (g+5 floors) building located at the extreme south-west corner outside the secretariat complex premises, mint compound, hyderabad (reserved for st category)
Construction of meeting hall on 6th floor with puf panel sheet roofing of newly constructed tgspdcl (g+5 floors) building located at the extreme south-west corner outside the secretariat complex premises, mint compound, hyderabad (reserved for st category)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreRenovation of dhs at p.n. complex,gurkhabasti during the year 2025 to26
Renovation of dhs at p.n. complex,gurkhabasti during the year &#x0d 2025 to26, repair and maintenance of existing vacant room &#x0d no 101 and 102 and attached garage room for establishment of new &#x0d office canteen and record room at ground floor of the dhs
Read moreRenovation of dhs at p.n. complex, gurkhabasti during the year 2024 to 25 at third floor.
Renovation of dhs at p.n. complex, gurkhabasti during the year 2024 to 25.
Read moreRenovation of dhs at p.n. complex, gurkhabasti during the year 2025 to 26
Renovation of dhs at p.n. complex, gurkhabasti during the year 2025 to 26
Read moreRenovation of office building of dfwpm at p.n. complex, gurkhabasti during the year 2024 to 25.
Renovation of office building of dfwpm at p.n. complex, gurkhabasti during the year 2024 to 25.
Read moreof your Industry type