Tender Details

Particulars Details
Title
1. Dahanu Road: Construction Of Rpf Barrack. 2. Valsad: Provision Of Infrastructure Facilities And Renovation To Railway School. (Composite Tender Including Electrical(power) Works)
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74791592
Reference
Number
BCT-24-25-127
Tender Fee 0
EMD 3.2 Lakh
Tender Value
Place Mumbai
Link https://www.ireps.gov.in/ireps/works/pdfdocs/092024/74791592/viewNitPdf_4548814.pdf
Start Date August 09, 2024 18:43
End Date

03/09/2024 ( Expired 301 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more
Ca no. cwe/hills/pgh/39 of 2025-2026 spl repair to road and other related works from stn hq gate to p-1/1, 7 e area and from bldg no p-3/3 to p-28/3 at 7 e area mil stn pithoragarhq

Ca no. cwe/hills/pgh/39 of 2025-2026 spl repair to road and other related works from stn hq gate to p-1/1, 7 e area and from bldg no p-3/3 to p-28/3 at 7 e area mil stn pithoragarh

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Construction of cc road from hokarjon to raja house and rajaram to rakesh gour house at ward 2

Construction of cc road from hokarjon to raja house and rajaram to rakesh gour house at ward 2

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Comprehensive repair to parking areas,security wall, pathways and other misc works at zone-1 and zone-2 offrs md accn under age b/r-ii of ge satwari

Comprehensive repair to parking areas,security wall, pathways and other misc works at zone-1 and zone-2 offrs md accn under age b/r-ii of ge satwari

Read more
Construction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)

Construction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect&amp#x0d phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)&amp#x0d

Read more
Const of 1 no 66kv line bay at 66kv s/s hsp road phagwara under rdss

Construction of additional foundations for 1no. 66kv line bay and allied civil works like trenches, gravel spreading at 66kv s/s hoshiarpur road phagwara (under op. circle jalandhar) (twl no. 165/nz/2023-24/annex-e) under rdss

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise