Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Operators Cabin, Bell Bar Eye (Lhs And Rhs) And 02 Nos. 100 Bush Fitting In The Bucket Eye And Rep. Of Hoist Brake Cylinder, Rep. Of Bull Gear, 02 Nos. Sprocket And Trip Gear Platform Of Ekg 5 A Shovel Si No. Hmb560 Cil No. Exc2640.
|
Description |
Repairing Of Operators Cabin, Bell Bar Eye (Lhs And Rhs) And 02 Nos. 100 Bush Fitting In The Bucket Eye And Rep. Of Hoist Brake Cylinder, Rep. Of Bull Gear, 02 Nos. Sprocket And Trip Gear Platform Of Ekg 5 A Shovel Si No. Hmb560 Cil No. Exc2640.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_320622_1 |
Reference Number |
SDOCM/PE(X)/E-Tender/24-25/21 |
Tender Fee | 0 |
EMD | 4600 |
Tender Value | |
Place | SDOCM, Dhori Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=332353 |
Start Date | November 07, 2024 15:30 |
End Date |
18/11/2024 ( Expired 175 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Read moreComplete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Read moreRepairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Read moreRepairing of crack developed in rhs pedestals base frame, reinforcement of rhs pedestal, re-building the worn-out teeth of bull gear and repairing of hoist gear cover of b-7 shovel of east section
Repairing of crack developed in rhs pedestals base frame, reinforcement of rhs pedestal, re-building the worn-out teeth of bull gear and repairing of hoist gear cover of b-7 shovel of east section
Read moreRepairing of machine housing, platform, railing, glass fitting and 02 nos. half broken hoist gear spline repairing, of machine sl no. hmb 419 shovel of rohini project, nk area.
Repairing of machine housing, platform, railing, glass fitting and 02 nos. half broken hoist gear spline repairing, of machine sl no. hmb 419 shovel of rohini project, nk area.
Read moreRepair of 02 no. feed cylinder mounting hole, pin making, material deposition in sliding system plate and base with grinding work of rotary gear box, rep. of feed chain sprocket and pin material filling, bush fitting and pin making of drill 1406
Repair of 02 no. feed cylinder mounting hole, pin making, material deposition in sliding system plate and base with grinding work of rotary gear box, rep. of feed chain sprocket and pin material filling, bush fitting and pin making of drill 1406
Read moreRepairing of (a) hoist coupling, equalizer sheave yoke assembly and damaged hoist pulley collar and (b) rhs drive shaft and driving wheel in ekg 5a shovel sl. no. 592 of jharkhand ocp.
Repairing of (a) hoist coupling, equalizer sheave yoke assembly and damaged hoist pulley collar and (b) rhs drive shaft and driving wheel in ekg 5a shovel sl. no. 592 of jharkhand ocp.
Read moreRepairing of mast cylinder eye and rep. of both side propel gear box driving sprocket, shaft and housing and denting and painting work of drill si no. 201506853 and rep. of both side track assy. of drill si no. 2015006936.
Repairing of mast cylinder eye and rep. of both side propel gear box driving sprocket, shaft and housing and denting and painting work of drill si no. 201506853 and rep. of both side track assy. of drill si no. 2015006936.
Read moreRepairing of 02 nos. bull gear and 02 nos. bull pinion along with repairing of spline of both side drive shaft and drive wheels of ekg shovel sl. no. 554 at tapin north ocp.
Repairing of 02 nos. bull gear and 02 nos. bull pinion along with repairing of spline of both side drive shaft and drive wheels of ekg shovel sl. no. 554 at tapin north ocp.
Read moreRepairing of swing circle and under carriage assy. of ekg 5a shovel si no. hmb597, rep. of final drive assy. of dumper si no. 60393 and rep. of bucket assy. and sprocket lugs of tata hitachi si no. 195.
Repairing of swing circle and under carriage assy. of ekg 5a shovel si no. hmb597, rep. of final drive assy. of dumper si no. 60393 and rep. of bucket assy. and sprocket lugs of tata hitachi si no. 195.
Read moreof your Industry type