Particulars | Details |
---|---|
Title |
Design Manufacture Supply Installation Testing And Commissioning Of Half Height Platform Screen Doors For Corridor 3 (Nehru Nagar Metro To Sholinganallur Metro) And Corridor 5 (Assissi Nagar Metro To Koyambedu Metro (Only Elevated Stations)) Of Cmrl
|
Description |
Design Manufacture Supply Installation Testing And Commissioning Of Half Height Platform Screen Doors For Corridor 3 (Nehru Nagar Metro To Sholinganallur Metro) And Corridor 5 (Assissi Nagar Metro To Koyambedu Metro (Only Elevated Stations)) Of Cmrl
|
Organisation | Chennai Metro Rail Limited | Central Govt. Ministry/Department |
Tender Id | 2023_CMRL_766357_1 |
Reference Number |
|
Tender Fee | 40000 |
EMD | 1.16 Crore |
Tender Value | |
Place | CHENNAI |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=805574 |
Start Date | November 28, 2023 20:30 |
End Date |
13/02/2024 ( Expired 508 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreDesign, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreDesign, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot
Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from
 dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreDesign and construction
Design and construction of 
 entry exit along with connecting bridge for elevated metro 
 stations of corridor 3 at nehru nagar, kandanchavadi, perungudi, 
 thoraipakkam, mettukuppam, ptc colony, okkiyampet, karapakkam 
 and okkiyam thoraipakam
Read moreSurvey, design, manufacture, supply, installation, testing and commissioning with five years comprehensive maintenance contract of total 97 kw capacity grid- connected spv power plant with net metering at various 12 police stations in nandurbar di
Survey, design, manufacture, supply, installation, testing and commissioning with five years&#x0d comprehensive maintenance contract of total 97 kw&#x0d capacity grid- connected spv power plant with net&#x0d metering at various 12 police stations in nandurbar di
Read moreof your Industry type