Tender Details

Particulars Details
Title
M And R To Udds In Badlapur Industrial Area. Removal Of Sludge From Mid Cs Effluent Collection Sumps.
Description
M And R To Udds In Badlapur Industrial Area. Removal Of Sludge From Mid Cs Effluent Collection Sumps.
Organisation Maharashtra Industrial Development Corporation | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 7580
EMD 19700
Tender Value
Place Badlapur
Link

AAAAAAAAAA

Login to view
Start Date June 09, 2025 23:30
End Date

17/06/2025 ( 12 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Widening and strengthening of nh 148b from km. 226.370 to km. 234.900 i.e. from tohana haryana border to moonak jakhal excluding stretch from km. 233.830 to km. 234.300 on epc mode in state of punjab

Widening and strengthening of nh 148b from km. 226.370 to km. 234.900 i.e. from tohana haryana border to moonak jakhal excluding stretch from km. 233.830 to km. 234.300 on epc mode in state of punjab

Read more
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

Read more
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25

One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25

Read more
One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise