Tender Details
Particulars | Details |
---|---|
Title |
Ttps Ichp Replacement Of Worn Out Stringer Channel, Vertical Supporting Angle To A Length Of 25 Mtrs. Each From Tail End Towards Head End Of Conveyor 36 A, 36 B
|
Description |
Ttps Ichp Replacement Of Worn Out Stringer Channel, Vertical Supporting Angle To A Length Of 25 Mtrs. Each From Tail End Towards Head End Of Conveyor 36 A, 36 B&Amp#X0d
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_528717_1 |
Reference Number |
CE/SE/MI/TTPS/173/2024-2025 |
Tender Fee | 0 |
EMD | 1800 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=629602 |
Start Date | February 28, 2025 21:00 |
End Date |
14/03/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps- echp-i- reconditioning of worn out head and tail conveyor pulleys and kept as common spare for belt feeders/ shuttle feeders of rbfd-20, 21, bfd-22,23,sfd-4a,4b at sch-i.
Ttps- echp-i- reconditioning of worn out head and tail conveyor pulleys and kept as common spare for belt feeders/ shuttle feeders of rbfd-20, 21, bfd-22,23,sfd-4a,4b at sch-i.
Read moreTtps- ichp- replacement of worn out and damaged portions of carrying idler frames and replacement of worn out stringer channel assembly in conveyor-54.
Ttps- ichp- replacement of worn out and damaged portions of carrying idler frames and replacement of worn out stringer channel assembly in conveyor-54.
Read moreTtps- ichp- replacement of worn out stringer channel, vertical supporting angle to a length of 25 mtrs. each from tail end towards head end of conveyor-36a, 36b
Ttps- ichp- replacement of worn out stringer channel, vertical supporting angle to a length of 25 mtrs. each from tail end towards head end of conveyor-36a, 36b&#x0d
Read moreEchpii upkeepment and clearing of coal on walkways, belt side to the entire length of conveyor, deck sheets from head end to tail end of conveyor 48a1 48b1 at sch ii
Echpii upkeepment and clearing of coal on walkways, belt side to the entire length of conveyor, deck sheets from head end to tail end of conveyor 48a1 48b1 at sch ii
Read moreTtps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm-i unit ii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit ii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreReplacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, rollers, fabrication and erection of same at 902-2 tail end side belt conveyor of ps-9 section at madhuban coal washe
Replacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, rollers, fabrication and erection of same at 902-2 tail end side belt conveyor of ps-9 section at madhuban coal washe
Read moreTtps operation circle mpm ii acp repairs and replacement of failed compressor in ac split ac renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii acp repairs and replacement of failed compressor in ac split ac renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 01.04.2025 to 31.03.2026
Read moreSpec.no.51-ii/24-25,works contract for laying of htug 11kv 3x300 sqmm cable to a length of 1650 mtrs. and 3 nos. 11kv dp structures with ab switch towards erection of 11kv pulikoradu feeder fed off from 110/33-11kv pudhuthangal ss by trenchle
Works contract for laying of htug 11kv 3x300 sqmm cable to a length of 1650 mtrs. and 3 nos. 11kv dp structures with ab switch towards erection of 11kv pulikoradu feeder fed off from 110/33-11kv pudhuthangal ss by trenchless method at tambara
Read moreof your Industry type