Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Outsourcing Of Augmentation Of Power Transformers Related Works On Partial Turnkey Mode Under Rdss Scheme Under Grid Construction Division Ludhiana
|
Description |
Labour Outsourcing For Augumentation And Additional Power Transformers
|
Organisation | Department of Power | State Govt. and UT |
Tender Id | 2024_POWER_131769_1 |
Reference Number |
10/GC/TS/PSPCL/2024-25 |
Tender Fee | 7080 |
EMD | 1.61 Lakh |
Tender Value | |
Place | Ludhiana Area |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=267495 |
Start Date | December 24, 2024 18:30 |
End Date |
08/01/2025 ( Expired 159 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreConstruction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Construction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreT-2324 design, detailed engg, supply,etc of 400/230-110kv ais ss with icts, switchgears, controlpanels, sas, controlroom and civil works at samugarengapuram on total turnkey under package1 of gec2 funded by mnre and kfw
T-2324 design, detailed engg, supply,etc of 400/230-110kv ais ss with icts, switchgears, controlpanels, sas, controlroom and civil works at samugarengapuram on total turnkey basis under package1 of gec2 funded by mnre and kfw
Read moreConstruction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Construction of 2l- ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Read moreConstruction of working women hostel on epc mode and thereafter dlp of 36 months, sector-1 at imt manesar under csr scheme.
Construction of working women hostel on epc mode and thereafter dlp of 36 months, sector-1 at imt manesar under csr scheme.
Read moreof your Industry type