Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Lt/B348 000 Wa Mr 3204/60
|
Description |
Pipe Cs Welded
|
Organisation | Engineers India Limited,MoPNG | Central Govt. Ministry/Department |
Tender Id | 2024_EIL_788914_1 |
Reference Number |
LT/B348-000-WA-MR-3204/60 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | AS PER BIDDING DOCUMENT |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=829225 |
Start Date | January 22, 2024 17:30 |
End Date |
05/02/2024 ( Expired 498 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreConsultancy services for prep of dpr of sewage pipe line network for all units of leh mil stn.
Consultancy services for prep of dpr of sewage pipe line network for all units of leh mil stn.
Read moreOne time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode
One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode
Read moreCs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Cs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Read moreCs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Read moreLaying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Read moreEngagement of consultant for preparation of fr, dpr and pre-award services for captive mode coal transportation from bermo mines to btps by construction of pipe conveyor system
Engagement of consultant for preparation of fr, dpr and pre-award services for captive mode coal transportation from bermo mines to btps by construction of pipe conveyor system
Read moreProcurement of 400 nb erw pipe for ash water recovery system under ahp-mm dept., ktps through capex 25-26
Procurement of 400 nb erw pipe for ash water recovery system under ahp-mm dept., ktps through capex 25-26
Read moreof your Industry type