Tender Details
Particulars | Details |
---|---|
Title |
[Supply Of Push Button Complete With Element For Elb Confirming To Rdso Spec No. Rdso/Spn/208/2012 Ver. 2.0 Suitable For Make Global Devices
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106448083 |
Reference Number |
80246156 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Gorakhpur |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/082024/106448083/viewNitPdf_4686647.pdf |
Start Date | August 21, 2024 18:56 |
End Date |
26/08/2024 ( Expired 267 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Deployment of 01 no.600 mt, 02 nos.400 mt and 01 no.250 mt capacity tyre mounted cranes with along with all accessories in complete in all respect pertaining to mechanical and associated facilities works tender for cold insulated pipeline
Deployment of 01 no.600 mt, 02 nos.400 mt and 01 no.250 mt capacity tyre mounted cranes with along with all accessories in complete in all respect pertaining to mechanical and associated facilities works tender for cold insulated pipeline
Read moreLaying of di pipe from bhainsa to wtp in connection to the work augmentation of water supply system along with ancillary work for patnagarh town under amrut 2.0
Laying of di pipe from bhainsa to wtp in connection to the work augmentation of water supply system along with ancillary work for patnagarh town under amrut 2.0
Read moreRenovation of 33/3.3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Renovation of 33 3 3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Read moreErection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Erection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Read moreSupply of bhel make or equivalent areca 3 controller for esp_ complete with firing card _ power supply box and cables _ 5 nos
Supply of bhel make or equivalent areca 3 controller for esp_ complete with firing card _ power supply box and cables _ 5 nos
Read moreFor supply and making of outdoor cable end termination with heat shrinkable jointing kit complete with all accessories including lugs suitable for 120 sq.mm size, 70 sq.mm of 3 core, xlpe aluminium cable conductor cable of 11kv grade for different ca
For supply and making of outdoor cable end termination with heat shrinkable jointing kit complete with all accessories including lugs suitable for 120 sq.mm size, 70 sq.mm of 3 core, xlpe aluminium cable conductor cable of 11kv grade for different ca
Read moreE.l.d.c.no.sm ii / p10 /1319/ 2025 supply of 4000 nos of led drivers suitable for 40 to 50w led fittings 1350 nos for 90 to 120w led fittings and 1900 nos for 150to 165w led fittings with driver output current of 1.05a and 0.7a r
&#x0d supply of 4000 nos of led drivers suitable for 40 to 50w led fittings 1350 nos for 90 to 120w led fittings and 1900 nos for 150to 165w led fittings with driver output current of 1.05a and 0.7a r
Read moreE.l.d.c no/s.m.ii /p3/1633/ 2025 supply and commissioning of 8 nos of 25 kva and 1 no. of 58.5 kva dg sets for 9 nos of gcc burial ground in zones 11 to 15 south region with camc for a period of 5 years after one year warranty period
E.l.d.c no/s.m.ii /p3/1633/ 2025 &#x0d supply and commissioning of 8 nos of 25 kva and 1 no. of 58.5 kva dg sets for 9 nos of gcc burial ground in zones 11 to 15 south region with camc for a period of 5 years after one year warranty period &#x0d &#x0d
Read moreE.l.d.c no/s.m.ii /p5/1630/ 2025 supply and installation of split air conditioner units of various capacities in gcc uphc uhwc for medicine storage rooms, pharmacies and laboratories across zones 6 to 10 central region with camc for a
Supply and installation of split air conditioner units of various capacities in gcc uphc uhwc for medicine storage rooms, pharmacies and laboratories across zones 6 to 10 central region with camc for a
Read moreE.l.d.c no/s.m.ii/p1/ 1400/ 2025 supply installation of split air conditioner units of various capacities in gcc uphc uhwc for medicine storage rooms, pharmacies and laboratories across zones 1 to 5 north region with comprehensive amc for 5yr period
Supply installation of split air conditioner units of various capacities in gcc uphc uhwc for medicine storage rooms pharmacies and laboratories across zones 1 to 5 north region with comprehensive amc for period of 5 years after one year warranty
Read moreof your Industry type