Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling And Soil Filling Of Road Median From Prithvinath Gate To Shankargarh Culvert And Soil Filling Work On Road Median From Delhi Gate To Hariparvat Intersection Within Agra Municipal Corporation Limits.
|
Description |
Dismantling And Soil Filling Of Road Median From Prithvinath Gate To Shankargarh Culvert And Soil Filling Work On Road Median From Delhi Gate To Hariparvat Intersection Within Agra Municipal Corporation Limits.
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2025_DOLBU_1005037_1 |
Reference Number |
06-02-2025/NAGAR NIGAM AGRA/25-02-2025/58 |
Tender Fee | 500 |
EMD | 14800 |
Tender Value | |
Place | AGRA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1798366 |
Start Date | February 13, 2025 18:30 |
End Date |
25/02/2025 ( Expired 127 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read more10-rcc drain construction work from vijay yadav house to siraj gautam house on the right side of biribirhan road.
Rcc drain construction work from vijay yadav house to siraj gautam house on the right side of biribirhan road.
Read moreBalance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.
Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.
Read moreCa no. cwe/hills/pgh/39 of 2025-2026 spl repair to road and other related works from stn hq gate to p-1/1, 7 e area and from bldg no p-3/3 to p-28/3 at 7 e area mil stn pithoragarhq
Ca no. cwe/hills/pgh/39 of 2025-2026 spl repair to road and other related works from stn hq gate to p-1/1, 7 e area and from bldg no p-3/3 to p-28/3 at 7 e area mil stn pithoragarh
Read moreSelection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur
Selection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreWork of installation , erection , dismantling of 1x10 mvar capacitor bank unit and carriage of capacitor bank from 400/132 kv s/s sector-123, noida to 132/33 kv s/s rudrapur and other associated work at 132 kv s/s rudrapur under etd, deoria
Work of installation , erection , dismantling of 1x10 mvar capacitor bank unit and carriage of capacitor bank from 400/132 kv s/s sector-123, noida to 132/33 kv s/s rudrapur and other associated work at 132 kv s/s rudrapur under etd, deoria
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreof your Industry type