Tender Details

About Tender

🏗️ Invitation For Bids: Construction Of Light Rob 🛣️ Ircon International Limited, A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of A Light Road Over Bridge (Rob) With A Ramp Facility For Light Vehicles At Level Crossing (Lc) No 72, Situated Between Gulzarbagh And Patna Saheb Stations Of The Danapur Division Of The East Central Railway In The State Of Bihar. 📍 Location: Patna City 📅 Bid Submission Deadline: April 27, 2024, 3:00 Pm 💸 Tender Fee: Inr 20,000 💸 Earnest Money Deposit (Emd): Inr 670,000 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And A Timeline For Project Completion, Adhering To The Guidelines Provided In The Tender Document. Keywords: Construction, Light Rob, Ramp Facility, Level Crossing, Ircon International Limited, Public Sector Undertaking, Tender, Bid Submission, Patna City, Bihar
Particulars Details
Title
Construction Of Light Rob With Ramp Facility For Light Vehicle At Lc No 72 Between Gulzarbagh Patna Saheb Stations Of Danapur Division Of East Central Railway In State Of Bihar
Description
Construction Of Light Rob With Ramp Facility For Light Vehicle At Lc No 72 Between Gulzarbagh Patna Saheb Stations Of Danapur Division Of East Central Railway In State Of Bihar
Organisation IRCON International Limited | Public Sector Undertakings
Tender Id 2024_IRCON_193004_1
Reference
Number
ROB-BIHAR/2034/Tender/2024/01
Tender Fee 20000
EMD 6.7 Lakh
Tender Value -
Place PATNA CITY
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=211365

Start Date April 20, 2024 14:30
End Date
Expired 27/04/2024

Expired 902 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Hyderabad division: sc-mue & jkm-bdhn section :proposed construction of 2 lane robs at (1) lc no.198 at km 482/900-483/000 between indalvai -sirnapalli stations (2) lc no.190a at km 455/200-300 between janakampet - nizamabad stations (3) lc no.18jb at km19/100-200 between janakampet-bodhan stations (4)lc no.209a at km 511/0-100 between uppalavai-kamareddy stations

Hyderabad division: sc-mue & jkm-bdhn section :proposed construction of 2 lane robs at (1) lc no.198 at km 482/900-483/000 between indalvai -sirnapalli stations (2) lc no.190a at km 455/200-300 between janakampet - nizamabad stations (3) lc no.18jb at km19/100-200 between janakampet-bodhan stations (4)lc no.209a at km 511/0-100 between uppalavai-kamareddy stations

Read more
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.

Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.

Read more
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]

S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]

Read more
1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push

1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push

Read more
Modification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations

Modification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations

Read more
Tvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section

Tvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section

Read more
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Read more
Spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations

Spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations

Read more
Bengaluru city-jolarpettai-- section: instrumentation of cable stayed bridge (rob no 832a) 1x45m+1x135m at km 341/800-342/000 between krishnarajapuram-whitefield stations. maintenance period is 3 months.

Bengaluru city-jolarpettai-- section: instrumentation of cable stayed bridge (rob no 832a) 1x45m+1x135m at km 341/800-342/000 between krishnarajapuram-whitefield stations. maintenance period is 3 months.

Read more
Palakkad division - shoranur -palakkad section- proposed construction of road over bridge in lieu of lc no. 156 at km 523/600-700 in between kanjikode & palakkad stations (moruglass gate)

Palakkad division - shoranur -palakkad section- proposed construction of road over bridge in lieu of lc no. 156 at km 523/600-700 in between kanjikode & palakkad stations (moruglass gate)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise