Tender Details

Particulars Details
Title
Restoration Of Road Cut Made By Cmwssb At North Wall Road Reach 1(ch 0 200m) In Division 53 ,Zone 5.And Restoration Of Road Cut Made By Cmwssb At North Wall Road Reach 2(ch 200 450m) In Division 53 Zone 5.
Description
Restoration Of Road Cut Made By Cmwssb At North Wall Road Reach 1(ch 0 200m) In Division 53 ,Zone 5.And Restoration Of Road Cut Made By Cmwssb At North Wall Road Reach 2(ch 200 450m) In Division 53 Zone 5.
Organisation Corporation of Chennai | State Govt. and UT
Tender Id 2025_CoC_561200_1
Reference
Number
B.R.R.C.No.B4/1345 and 1346 /2025
Tender Fee 0
EMD 32000
Tender Value
Place CHENNAI
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=670146
Start Date May 24, 2025 23:30
End Date

30/05/2025 ( Expired 17 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Strengthening of roads in sector 1 2 3 of yojna no 1 chandausi and the adjacent road from kali mandir to matrumals dharamshala at distt sambhal under infrastructure work

Strengthening of roads in sector 1 2 3 of yojna no 1 chandausi and the adjacent road from kali mandir to matrumals dharamshala at distt sambhal under infrastructure work

Read more
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc

Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&amp#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Construction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5 and 6 of anchor 1 to anchor 2 and anc 2 to saddle 3 between anchor 2 and 3 of power house vi penstock

Construction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5 and 6 of anchor 1 to anchor 2 and anc 2 to saddle 3 between anchor 2 and 3 of power house vi penstock

Read more
Construction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs

Construction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs

Read more
Construction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs

Construction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs

Read more

Restoration of rain cuts and flank protection during monsoon at rajgram mohanpur road from 0.00km to 12.00km under rampurhat highway sub division under birbhum highway division -i during the year 2025-26.

Read more
Engagement of user fee collection agency on the basis of cb through e-tender for kesla tp at km 198.967 for the work of rehabilitation and up-gradation of nh-200 from design ch.178.944 to 241.533 to 2-lane with paved shoulder in chhattisgarh

Engagement of user fee collection agency on the basis of cb through e-tender for kesla tp at km 198.967 for the work of rehabilitation and up-gradation of nh-200 from design ch.178.944 to 241.533 to 2-lane with paved shoulder in chhattisgarh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise