Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏗️ Invitation For Independent Engineer Services 🛣️ The National Highways And Infrastructure Development Corporation Limited (Nhidcl), Under The Central Government, Invites Bids From Qualified Professionals For The Role Of Independent Engineer For The Widening/Improvement To 4 (Four) Lane With Paved Shoulder On Nh 17 In The State Of Assam, Under The Hybrid Annuity Mode. 📅 Bid Submission Deadline: May 1, 2024, 3:00 Pm Tender Fee: Inr 5900 Emd: Inr 200000 This Project Is A Critical Part Of The Infrastructure Development In Assam And Requires A Competent Independent Engineer To Oversee The Project's Execution. Interested Candidates Should Submit Their Proposals, Including Detailed Qualifications, Experience, And Financial Bids, By The Specified Deadline. Keywords: Nhidcl, Independent Engineer, Nh 17, Infrastructure Development, Hybrid Annuity Mode, Assam, Central Government, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Nhidcl/Assam/Nh 17/Ie/Bil Ghy /Pkg 2/Ham/2024
|
Description |
Independent Engineer Services For Widening/Improvement To 4 (Four) Lane With Paved Shoulder From Bilasipura Guwahati Package 2 Of In The State Of Assam On Hybrid Annuity Mode.
|
Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
Tender Id | 2024_NHIDC_801011_1 |
Reference Number |
NHIDCL/Assam/NH-17/IE/Bil-Ghy /Pkg-2/HAM/2024 |
Tender Fee | 5900 |
EMD | 2 Lakh |
Tender Value | |
Place | Assam |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841997 |
Start Date | April 10, 2024 17:30 |
End Date |
09/05/2024 ( Expired 425 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreAAAAAAAAAA
Login to viewSpecialized slope protection work of section from km. 25.600 to km. 26.100 bagrakot kafer of nh 717 a in west bengal on epc mode pkgivc 2nd call
Read moreRfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreIe services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreIe services during o and m of the stretch tolling omt of four lane with paved shoulders of (i) nh-27 from kachugaon-rakhaldubi bus junction (ii) nh-27 from rakhaldubi bus junction-kaljharand (iii) nh-27 from kaljhar-pattarcharkuchi in assam
Ie services during o and m of the stretch tolling omt of four lane with paved shoulders of (i) nh-27 from kachugaon-rakhaldubi bus junction (ii) nh-27 from rakhaldubi bus junction-kaljharand (iii) nh-27 from kaljhar-pattarcharkuchi in assam
Read moreNhidcl/ro-agt/w/t/s -k(pkg-v)/323-part(1)
Special repair work on nh-208 from km 75.700 to km 101.30 (total 
 length 25.600 km) at various sections srirampur to khowai section 
 at the risk and cost of epc contractor in the state of tripura in the fy 
 2025-26 on item rate basis work or
Read moreof your Industry type