Tender Details

Particulars Details
Title
Ttps Mech Ii Bm Unit Iv Removal And Relaying Of Insulation With Cladding On Hot Primary Air Duct Hot Secondary Air Ducts Flue Gas Ducts And Airpreheater Areas Of Unit Iv For The Year 20242025
Description
Ttps Mech Ii Bm Unit Iv Removal And Relaying Of Insulation With Cladding On Hot Primary Air Duct Hot Secondary Air Ducts Flue Gas Ducts And Airpreheater Areas Of Unit Iv For The Year 20242025
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_455068_1
Reference
Number
CE/TTPS/SE/M-II/No.238/2024-25
Tender Fee 0
EMD 3400
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=541314
Start Date June 17, 2024 19:30
End Date

02/07/2024 ( Expired 292 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply of 6 mm thick m s plate for unit ii airpreheater flue gas duct air duct and mdc as per is 2062

Supply of 6 mm thick m s plate for unit ii airpreheater flue gas duct air duct and mdc as per is 2062

Read more
Bm-bending fabrication erection of the damaged worn-out portion / replacement of guide vanes for flue gas ducts of unit-ix during overhaul of unit -ix.

Bm-bending fabrication and erection of the damaged worn out portion replacement of guide vanes for flue gas ducts of unit ix during overhaul of unit ix.

Read more
Supply of insulation pads, g.p. sheet and fixing the same over the outer surface of steam, feed water, drain, ibd tank, aph, secondary , primary air ducts, flue gas path from boiler to esp out let gate, outer surface of duct pa,fd,id

Supply of insulation pads, g.p. sheet and fixing the same over the outer surface of steam, feed water, drain, ibd tank, aph, secondary , primary air ducts, flue gas path from boiler to esp out let gate, outer surface of duct pa,fd,id

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Read more
Supply and delivery of lrb matress for boiler aph and air flue gas duct for unit 4 overhauling for kolaghat thermal power station

Supply and delivery of lrb matress for boiler aph and air flue gas duct for unit 4 overhauling for kolaghat thermal power station

Read more
Ttps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler

Ttps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler

Read more
Ttps mech ii bm unit iv v clearing of ash powder fire hazardous materials around id fans and attending breakdown works in fg duct of unit iv v for the period from 01 04 2025 to 31 03 2026

Ttps mech ii bm unit iv v clearing of ash powder fire hazardous materials around id fans and attending breakdown works in fg duct of unit iv v for the period from 01 04 2025 to 31 03 2026

Read more
Ttps mech ii tm ii removal and refixing of insulation in turbine casing valves and allied pipe lines in unit iv v for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm ii removal and refixing of insulation in turbine casing valves and allied pipe lines in unit iv v for the period from 01 04 2025 to 31 03 2026

Read more
Ttps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03

Ttps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03

Read more
Ttps mech ii bm unit i ii iii attending prive breakdown works in id fans airpreheater and its connected ducts of unit i ii iii for the period from 01 04 2025 to 31 03 2026

Ttps mech ii bm unit i ii iii attending prive breakdown works in id fans airpreheater and its connected ducts of unit i ii iii for the period from 01 04 2025 to 31 03 2026

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise